My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
directors, partners, employees, agents, consultants and subcontractors of each and any of them) <br />Owner and the Engineer. <br />SC -5.08 Delete existing paragraph 5.08 of the General Conditions in its entirety <br />SC -5.09 Delete existing paragraph 5.09 of the General Conditions in its entirety. <br />ARTICLE 6 - CONTRACTOR'S RESP'ONSIBILIT'IES <br />SC 6.018 Delete paragraph 6.018 of the General Conditions in its entirety, and replace with the <br />following: <br />8.01 B The Contractor shall employ a competent superintendent and necessary assistants who shall be <br />assigned to, and in attendance at. the Project site durit ,- performance of the Work. The <br />superintendent shall be reasonably satisfactory to the Owner. So long as the superintendent remains <br />employed by the Contractor or any related entity, the superintendent shall not be replaced without the <br />Owner's prior written consent, except under extraordinary circumstances. The superintendent shall <br />represent the Contractor. and communications given to the superintendent shall be as binding as if <br />given to the Contractor. <br />SC -6.028 Add the following new paragraphs immediately after paragraph 6.028. of the General <br />Conditions which are to read as follows: <br />C. Regular working hours are defined as 8 hours per day, Monday through Friday, excluding holidays, <br />between the hours of 7:00 AM and 7:00 PM. Requests to work other than regular working hours shall <br />be submitted to Engineer not less than 48 hours prior to any proposed weekend work or scheduled <br />extended work weeks. Occasional unscheduled overtime on weekdays may be permitted provided two <br />hours notice is given to Engineer. <br />D. Contractor shall reimburse the Owner for additional engineering and/or inspection costs incurred as <br />a result of overtime work in excess of the regular working hours stipulated in Article SC -6.02C At <br />Owner's option, overtime costs may either be deducted from the Contractor's monthly payment request <br />or deducted from the retainage prior to release of final payment. Overtime costs for the Owner's <br />personnel shall be based on the individual's current overtime wage rate. Overtime costs for personnel <br />employed by the Engineer or Owner's independent testing laboratory shall be calculated in accordance <br />with the terms of their respective contracts with the Owner. <br />SC 6.04A.1 Add the following sentence immediately after the existing text in paragraph 6.04 A 1 of the <br />General Conditions: <br />Additionally, any and all changes to the Project's critics? path must be reflected in each Project <br />schedule_ <br />SC -6.04 A 3 Add the following paragraph immediately after paragraph GC -6 04 A 2 of the General <br />Conditions <br />Contractor shall give Owner full information in advance as to its plans for performing each part of the <br />Work. If at any time during the progress of Work, Contractor's actual progress is inadequate to meets <br />the requirements of the Contract, Owner may, but is not obligated to, so notify Contractor In such <br />event, Contractor acknowledges and agrees that Contractor shall implement sante or ail of the <br />following remedial actions at the sole cost and expense of Contractor. (a) Increase manpower in such <br />quantities and crafts as necessary to eliminate the backlog of Work: (o) Increase the vurnbe• of <br />woo ing hours per shifu shifts per .tiorkrng clay, working days per weer, !Alis amount of constrticvon <br />equij,g est or any conitmiation of the fo!egoing to ehern`nate the bay kloj or Wwk or (c) Resr,t ejuie <br />1008001 <br />I) - 4 '; �.i.; 'd Uri N✓hrri-.,,��ta�rr'd �'f Ct 9:::,cT ';I.,,v, <br />
The URL can be used to link to this page
Your browser does not support the video tag.