Laserfiche WebLink
WORK CHANGE DIRECTIVE <br />DATE: No <br />PROJECT: 16" Reuse Water Main Extension Along Lateral G Canal -AND-_16" Reuse Water - <br />57th Street to 53rd Street <br />OWNER: Indian River Countv Utilities 1801 27"' Street, Vero Beach, FL 32960_ <br />(Name, Address) <br />CONTRACTOR: OWNER's Project No.: UCP # 2830 <br />ENGINEER: _Masteller & Moler, Inc. <br />CONTRACT FOR: ENGINEER's Project No. 0627 _ <br />You are directed to proceed with the following change(s): <br />Description: ---- <br />Purpose of Work Directive Change: <br />Attachment(s) (fist documents supporting change): <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, any claim <br />for a Change Order based thereon will involve one of the following methods of determining the effect <br />of the change(s). <br />Method of determining change in Contract Price: Method of determining change in Contract Time: <br />[ ] Time and Materials [ J Contractor's records <br />[ ] unit Prices <br />j J Cost plus fixed fee <br />Estimated increase (decrease) in Contract Price <br />$_ _ _ _ . If the <br />change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />[ ] Engineer's records <br />[ J Other <br />Estimated increase (decrease) in Contract Time <br />_ days. If the change involves an <br />increase, the estimated time is not to be exceed <br />without further authorization <br />Once the Work covered by the directive is completed or final cost and time determined, Contractor <br />should submit documentation for inclusion in a change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR THE CONTRACT TIME. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />RECOMMENDED: <br />By <br />Engineer <br />Date: <br />D \DiYrS;QN r L9800 supplo°'enet:,tard Cnn(JA o"s 1c,c <br />APPROVED <br />By: <br />Owner <br />Date: <br />00800-22 <br />