My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK CHANGE DIRECTIVE= <br />INSTRUCTIONS <br />A. GENERAL INFORMATION <br />This document was developed for use in situations involving changes in the Work which, if not <br />processed expeditiously, might delay the Project. These changes are often initiated in the field and <br />may affect the Contract Price or the Contract Times. This is not a Change Order, but only a directive to <br />proceed with Work that may be included in a subsequent Change Order. <br />For supplemental instructions and minor changes not involving a change in the Contract Price or the <br />Contract Times a Field Order should be used. <br />B. COMPLETING THE WORK CHANGE DIRECTIVE FORM <br />Engineer initiates the form, including a description of the items involved and attachments. <br />Based on conversations between Engineer and Contractor. Engineer completes the following. <br />METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method to <br />be used in determining the final cost of Work involved and the estimated net effect on the <br />Contract Price. If change involves an increase in the Contract Price and the estimated amount <br />is approached before the additional or changed Work is completed, another Work Change <br />Directive must be issued to change the estimated price or Contractor may stop the changed <br />Work when the estimates time is reached. If Work Change Directive is not likely to change the <br />Contract Price, the space for estimated increase (decrease) should be marked "Not <br />Applicable". <br />Once Engineer has completed and signed the form, all copies should be sent to Owner for <br />authorization because Engineer alone does not have authority to authorize changes in Price or Times. <br />Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and Times may <br />only be changed by Change Order signed by Owner and Contractor with Engineer's recommendation <br />Paragraph. 10.03.A.2 of the General Conditions requires that a Change Order be initiated and <br />processed to cover any undisputed sum or amount of time for Work actually performed pursuant to this <br />Work Change Directive. <br />Once the Work covered by this directive is completed or final cost and times are determined. <br />Contractor should submit documentation for inclusion in a Change Order. <br />THIS IS A DIRECTIVE T PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR CONTRACT TIMES. A CHANGE ORDER. IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />00800.23 <br />0 "Div s;QN, U oc-& % Sopp*rrentary CQnd4tions dot <br />
The URL can be used to link to this page
Your browser does not support the video tag.