My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF SUBSTANTIAL COMPLETION <br />PROJECT 16" Reuse Lateral G Canal -AND- 16" Reuse Water - <br />57th Street to 53rd Street <br />DATE OF ISSUANCE <br />OWNER -__ Indian River -COu y Board of CpuDty Go�mniissioners <br />OWNER's Contract No. UCP #_2630 M&M Project No. 0627 <br />lle <br />CONTRACTOR _ _ ENGINEER _Master �� Moler Inc <br />This Cortificate of Substantial Completion applies to all Work under the Contract Documents or to the <br />following specified parts thereof: <br />To: Indian River County <br />OWNER <br />And To <br />CONTRACTOR - y <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that ',!Mork is hereby declared to be substantially <br />complete in accordance with the contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of CONTP.AC7OR to <br />complete all the Work in accordance with the contract Documents. The items in the tentative list shall <br />be completed or corrected by CONTRACTOR within Days of the above date of Substantial <br />Completion. <br />EJCDC No C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00600-29 <br />I Llllv'i4if-IN ,ISS S FialG nt':9aFrf;;F 7t;,frbciC�t <br />
The URL can be used to link to this page
Your browser does not support the video tag.