Laserfiche WebLink
From the date of Substantial Completion, the responsibilities between OWNER aria CONTRACTOR <br />for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees <br />shall be as follows: <br />RESPONSIBILITIES- <br />ESPONSIBILITIES- <br />OWNER.- <br />OWNER: <br />CONTRACTOR- <br />CONTRACTOR- <br />The <br />The following documents are attached to and made a part of this Certificate <br />(For items to he attached see definition of Substantial Completion as supplemented and other <br />specifically noted conditions precedent to achieving Substantial Completion as required by Contract <br />Uacuments.) <br />This certificate does not constitute an acceptance of Work not in accordance with the Contract <br />Documents <br />nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract <br />Documents. <br />Executed by ENGINEER on <br />By: <br />ENGINEER <br />(Authorized Signature) <br />CONTRACTOR accepts this Certificate of Substantial Completion on <br />CONTRACTOR <br />LM <br />20 <br />OWNER accepts this Certificate of Substantial Completion on i 20 <br />By <br />(Authorized Signature) <br />00600-30 <br />