My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A copy of said Contract is incorporated herein by refere,lce and is made a part hereof as if fully <br />copied within. <br />1.03 WORK BY OTHERS <br />A. Any work performed by others prior to or in conjunction with the Work of this Contract, the <br />CONTRACTOR shall cooperate with other CONTRACTOR's on the site. <br />B interference With Work on Roads/Utilities: the CONTRACTOR shall cooperate: fully with <br />all utility forces of the OWNER or forces of other public or private agencies engaged in <br />relocation. altering, or otherwise rearranging of any Road/Utility facilities which interfere <br />with the progress of the Work, and shall schedule the Work so as to rninimize interference <br />with said relocation, altering, or other rearranging of facilities CONTRACTOR shall <br />minimize road lane closures and obtain County approval in writing and secure any <br />necessary permits prior to any lane closures or woi in the right-of-way. <br />C. Concurrent Work by Other CONTRACTOR's: The CONTRACTOR's attention is directed <br />to the fact that work may be conducted adjacent to or on the site by other <br />CONTRACTOR's during the performance of the Work of this Contract. The <br />CONTRACTOR shall conduct its operations so as to cause a minimum of interference <br />with the Work of such other CONTRACTOR's. <br />D. Refer to the General Conditions for additional requirements <br />1.04 WORK SEQUENCE <br />A. Perforin Work to ensure completion of the Work within the Contract Time. Completion <br />dates of the various stages shall be in accordance with the approved construction <br />schedule submitted by the CONTRACTOR. The CONTRACTOR shall provide a written <br />plan and schedule in the event he desires to perform work from different stages <br />concurrently. A written plan describing the CONTRACTOR's intent must be submitted for <br />approval by the ENGINEER. <br />1.05 CONTRACTOR's USE OF PREMISES <br />A. CONTRACTOR shall have use of the premises as indicated on the drawings for the <br />performance of the Work, subject to ongoing work by other CONTRACTOR's and the <br />County. <br />S. Coordinate use of premises with OWNER and ENGINEER - <br />C. CONTRACTOR shall assume full responsibility for security of all his and his sub- <br />CONTRACTOR's materials and equipment stored on the site. <br />O. If directed by the OWNER or ENGINEER, move any stored items which interfere with <br />operations of OWNER or other CONTRACTOR's. <br />E. Obtain and pay for use of additional storage or work areas if needed to perform the Work. <br />F. The CONTRACTOR shall be responsible for obtaining temporary sanitary facOies during <br />construction and all associated costs. <br />PART 2- PRODUCT' mot usecif <br />01010: <br />
The URL can be used to link to this page
Your browser does not support the video tag.