My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 - EXECUTION <br />3.01 GENERAL <br />A. The CONTRACTOR shall coordinate construction and reconstruction work with the <br />OWNER and ENGINEER Unless otherwise indicated, the CONTRACTOR shall be <br />responsible for the sequence of the work. All work shall be performed in accordance with <br />applicable safety rules and regulations. <br />B. The CONTRACTOR shall insure that any utilities connected to structures, equipment, and <br />facilities to be removed, relocated, salvaged, replaced, or abandoned shall be rendered <br />inoperable, replaced with new utilities, or adequately bypassed with temporary utilities <br />before proceeding with reconstruction. <br />C. The CONTRACTOR shall take precautions to avoid damage to adjacent facilities and to <br />limit the reconstruction activities to the extent i-dicated. If reconstruction beyond the <br />scope indicated is required. the CONTRACT OR shall obtain approval from the <br />ENGINEER prior to commencing work. <br />3.02 DISPOSAL <br />A. Clearing and grubbing and removal of debris, where necessary, shall minimize <br />interference with roads, streets, walks, and other adjacent occupied or used facilities <br />which shall not be closed or obstructed without permission from the OWNER. Alternate <br />routes shall be provided around closed or obstructed traffic ways. <br />B. Site debris, rubbish, and other materials resulting from reconstruction operations shall be <br />legally removed and disposed of at the CONTRACTOR's expense. Structures and <br />equipment to be demolished shall be cleaned prior to demolition and the wash water <br />properly disposed. No trace of these structures shall remain prior to placing of backfill in <br />the areas from which structures were removed. <br />C. Refuse, debris, and waste materials resulting from demolition and site clearing operations <br />shall not be burned. All refuse and waste material shall be disposed of at the IRC Landfill <br />with the CONTRACTOR paying all transportation and disposal fees. <br />*END OF SECTION* <br />01010-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.