My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Document requests for substitutions for Products as specified in Section 01630. <br />8.07 PREPARATION OF CHANGE ORDERS <br />A. Engineer will prepare each Change Order. <br />B. Form: Change Order format provided in the Contract Documents <br />C. Change Order will describe changes in the Work, both additions and deletions, <br />with attachments of revised Contract Documents to define details of change. <br />D. Change Order will provide an accounting of the adjustment in the Contract Sum <br />and in the Contract Time. <br />1.08 LAMP SUM / FIXED PRICE CHANGE ORDER <br />A. Content of Change Orders will be based on either: <br />1. Engineer's Proposal Request and Contractor's responsible Proposal as <br />mutually agreed upon between OWNER and Contractor. <br />2. Contractor's Proposal for a change, as recommended by Engineer <br />B. Owner and Engineer will sign and date the Change Order as authorization for the <br />contractor to proceed with the changes. <br />C. Contractor shall sign and date the Change Order to indicate agreement with the <br />terms therein. <br />1.09 UNIT PRICE CHANGE ORDER <br />A. Content of Change Orders will be based on, either: <br />1. Engineer definition of the scope of the required changes. <br />2. Contractor's Proposal for a change, as recommended by Engineer. <br />3. Survey of completed work <br />B. The amount of the unit prices shall be: <br />1. Those stated in the Agreement. <br />2. Those mutually agreed upon between Owner and Contractor <br />C. When quantities of each of the items affected by the Change Order can be <br />determined prior to start of the work: <br />1. Owner and Engineer will sign and date the Change Order as authorization <br />for Contractor to proceed with the changes. <br />2. Contractor shall sign and date the Change Order to indicate agreement with <br />the terms therein. <br />D. When quantities of the items cannot be determined prior to start of the work: <br />1. Engineer or Owner will issue a Change Order directing Contractor to <br />proceed with the change on the basis of unit prices, and will cite the <br />applicable unit prices. <br />01035-3 <br />0 WIVISION 1101035 Change Order Proceaures.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.