My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. At completion of the change, Engineer will determine the cost of such work <br />based on the unit prices and quantities used. <br />a. Contractor shall submit documentation to establish the number of <br />units of each item and any claims for a change in Contract Time. <br />3. Engineer will sign and date a second Change Order to establish the change <br />in Contract Sum and in Contract Time. <br />4. Owner and Contractor will sign and date the second Change Order to <br />indicate their agreement with the terms therein. <br />1.10 TIME AND MATERIAL / FORCE ACCOUNT CHANGE ORDER / CONSTRUCTION <br />AUTHORIZATION <br />A. Engineer and Owner will issue a Work Direc,t /e Change directing Contractor to <br />Proceed with the changes on a time -and -material / force account basis. <br />B. At completion of the change, Contractor shall submit itemized accounting and <br />supporting data as provided in the Article "Documentation of Proposals and <br />Claims" of this section. <br />C. Engineer will determine the allowable cost of such work, as provided in General <br />Conditions and Supplementary Condition <br />D Engineer will sign and date the Change Order to establish the change in Contract <br />Sum and in Contract Time. <br />E. Owner and Contractor will sign and date the Change Order to indicate their <br />agreement therein. <br />1.11 CORRELATION WITH CONTRACTOR'S SUBMITTALS <br />A. Contractor shall periodically revise Schedule of Values and Request for Payment <br />forms to record each change as a separate item of V!lork, and to record the <br />adjusted Contract Sum. <br />B. Contractor shall periodically revise the Construction Schedule to reflect each <br />change in Contract Time. <br />1. Revise sub -schedules to show changes for other items of work affected by <br />the changes <br />C. Upon completion of work under a Change Order, enter pertinent changes in <br />Record Documents. <br />PART 2 -- PRODUCTS (not applicable <br />PART 3 — EXECUTION (not applicable) <br />*END OF SECTION* <br />01035-4 <br />D'UVISION 1101035 Change Order Procedures.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.