Laserfiche WebLink
SECTION 01050 <br />FIELD ENGINEERING <br />PART 1_-- . GENERAL <br />1.01 SCOPE OF WORK <br />A. Provide and pay for `yield engineering services required for project. <br />1. Survey work required in execution of project. <br />2. Civil, structural or other professional Engineering services specified. or required <br />to execute Contractor's construction methods <br />B The Contractor shall retain the services of a registered land surveyor licensed in the <br />State of Florida: <br />1. Identify existing control points and property line corner stakes indicated on the <br />Drawings, as required. <br />2. Maintain an accurate location of all buried piping 4 -inch in diameter and larger. <br />1.02 RELATED WORK <br />A. Standard General Conditions of the Construction Contract are included in Section <br />00700. <br />B. Summary of Work is included in Section 01010. <br />C. Applications for Payment are included in Section 01052. <br />D. Contract Closeout is included in Section 01700. <br />1.03 SUBMITTALS <br />A. Submit, in accordance with Section 01300, name and address of registered land <br />surveyor or professional Engineer. <br />B. On request of the Engineer, submit documentation to verify accuracy of field <br />engineering work. <br />C. Submit certificate signed by registered Engineer or land surveyor certifying that <br />elevations and locations of improvements are in conformance, or non-conformance, <br />with Contract Documents. <br />D. At the end of the project, and prior to final payment, submit certified drawings with <br />the Surveyors title block (signed and sealed by the registered land surveyor) of the <br />items listed below. Vertical Control shall conform to the NGVD 1929 datum. <br />These drawings shall be included with, and made a part of, the project record <br />documents - <br />01050 -1 <br />OADIVISION 1101050 Field Engineering.doc <br />