My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01050 <br />FIELD ENGINEERING <br />PART 1_-- . GENERAL <br />1.01 SCOPE OF WORK <br />A. Provide and pay for `yield engineering services required for project. <br />1. Survey work required in execution of project. <br />2. Civil, structural or other professional Engineering services specified. or required <br />to execute Contractor's construction methods <br />B The Contractor shall retain the services of a registered land surveyor licensed in the <br />State of Florida: <br />1. Identify existing control points and property line corner stakes indicated on the <br />Drawings, as required. <br />2. Maintain an accurate location of all buried piping 4 -inch in diameter and larger. <br />1.02 RELATED WORK <br />A. Standard General Conditions of the Construction Contract are included in Section <br />00700. <br />B. Summary of Work is included in Section 01010. <br />C. Applications for Payment are included in Section 01052. <br />D. Contract Closeout is included in Section 01700. <br />1.03 SUBMITTALS <br />A. Submit, in accordance with Section 01300, name and address of registered land <br />surveyor or professional Engineer. <br />B. On request of the Engineer, submit documentation to verify accuracy of field <br />engineering work. <br />C. Submit certificate signed by registered Engineer or land surveyor certifying that <br />elevations and locations of improvements are in conformance, or non-conformance, <br />with Contract Documents. <br />D. At the end of the project, and prior to final payment, submit certified drawings with <br />the Surveyors title block (signed and sealed by the registered land surveyor) of the <br />items listed below. Vertical Control shall conform to the NGVD 1929 datum. <br />These drawings shall be included with, and made a part of, the project record <br />documents - <br />01050 -1 <br />OADIVISION 1101050 Field Engineering.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.