Laserfiche WebLink
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an <br />agreement with Owner in the form included in the Contract Documents to perform and <br />furnlsh all work as specified or indicated in the Contract Documents for the Contract Price <br />and within the Contract Time indicated in the Contract Documents and in accordance with <br />the other terms and conditions of the Contract Documents. <br />2. Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and <br />Instructions to Bidders. T his Bid will remain subject to acceptance for ninety (90) days after <br />the day of Bid opening. Bidder will sign and submit the Agreement with the bonds and <br />other documents required by the Bidding requirements within ten (90) calendar days after <br />the date of Owner's Notice of Award. <br />3. In submitting this Bid, Bidder represents, as mora fully set forth in the Agreement, that: <br />(a) Bidder has examined copies of all the Bidding Documents and of the following <br />Addenda (receipt of all which is hereby ac' lowiedged): <br />Date Number <br />7/09 <br />(b) Bidder has familiarized itself with the nature and extent of the Contract Documents, <br />the work, site, locality, and all local conditions and laws and regulations that in any <br />manner may affect cost, progress, performance or finishing of the work. <br />(c) Bidder has studied carefully all reports and drawings of subsurface conditions and <br />drawings of physical conditions which are identified in Paragraph SC -4.02 of the <br />Supplementary Conditions of the extent of the technical data contained in such <br />reports and drawings upon which Bidder is entitled to rely. <br />(d) Bidder has obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, Investigations, explorations, tests, <br />reports and studies (in addition to or to supplement those referred to in (c) above) <br />which pertain to the subsurface or physical conditions at or contiguous to the site or <br />otherwise may affect the cost, progress, performance or furnishing of the work as <br />Bidder considers necessary for the performance or furnishing of the work at the <br />contract price, within the contract time and in accordance with the other terms and <br />conditions of the contract documents, Including specifically the provisions of <br />Paragraph 4.02 of the General Conditions, and no additional exarriination, <br />investigations, explorations, test, reports, studies or similar information or date or <br />will be required by Bidder for such purposes. <br />(e) Bidder has reviewed and checked .all information and data shown or indicated on <br />the Contract Documents with respect to existing underground facilities at or <br />contiguous to the site and assumes responsibility for the accurate location of said <br />underground facilities. No adddlonal examinations, lnvestigatioras, explorations; <br />tests, reports, studies or similar information or, data in respect of said underground <br />00300,,2 <br />Y:inv��k^QOi 27V�?fi ;W SMCinC.,�1T 0NS - Gated 0627 & (b7701.e":S'�r SiON Va`?�` 0 Old FOM.Ox <br />