Laserfiche WebLink
(c) From 121 calendar days to 150 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perfonn contract closeout procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />6. The following documents are attached to and made a part of this Rid: <br />(a) Certificate of Compliance with the Florida Trench Safety Act (Section 00300 Bid <br />Form). <br />(b) Disclosure of Relationships (Sectioli 004521 <br />(c) General Infonnation Required for Bidders (S' L - "'ion t3W:66) <br />7. The terms used in this Chid, which are defined in the General Conditions of the <br />Construction Contract included as part of the Contract Documents, have the <br />meanings assigned to them in the General Conditions. Contractor acknowledges <br />the insurance requirements of Section 00700 as amended by Section 00800 and <br />any other addendums and agrees to provide said insurance upon award of contract. <br />00300-4 <br />Y 5rexm� 7�A i?Gt lO ,r K`�ATroAiS - *W 0627 & p x74 lit S t3X5rW) W FOM -dM <br />