My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01381 <br />AUDIO-VISUAL DOCUMENTATION <br />PART 1 —GENERAL <br />1.01 SCOPE OF WORK <br />Prior to commencing of the Work, the Contractor shall have a continuous color audio -video <br />tape recording taken along the entire length of the project to serve as a record of <br />preconstruction conditions. The preconstruction Swale elevations shall be recorded at 100' <br />intervals. <br />1.02 RELATED WORK <br />A. Summary of Work is Included in Section 01010. <br />B. Contract Closeout is included in Section 01700. <br />1.03 APPROVAL <br />No construction shall begin prior to review and acceptance of the tapes covering the <br />construction area by the Engineer. The Engineer shall have the authority to reject all or any <br />portion of a videotape not conforming to specifications and order that it be redone at no <br />additional charge. The Contractor shall reschedule unacceptable coverage within five (5) days <br />after being notified. The Engineer shall designate those areas: if any, to be omitted from or <br />added to the audio -video coverage. Tape recordings shall not be made more than thirty (30) <br />days prior to beginning of construction of any area. All tapes and written records shall become <br />the property of the Owner. The tapes shall be delivered to the Owner as soon as, possible after <br />recording. <br />1.04 QUALITY ASSURANCE <br />The Contractor shall engage the services of a professional electrographer. The color audio - <br />video tapes shall be prepared by a responsible commercial firm known to be skilled and <br />regularly engaged in the business of preconstruction color audio -video tape documentation. <br />PART 2 — PRODUCTS <br />2.01 GENERAL <br />All equipment, accessories, materials, and labor to perform this service shall be furnished by <br />the Contractor. <br />2.02 QUALITY <br />The total audio -video system shall reproduce bright, sharp, clear pictures with accurate colors <br />and shall have minimal distortion; tearing, rolls, or other imperfections. The audio portion of <br />the recording shall reproduce the commentary of the camera operator with proper volume and <br />clarity and be free from distortion and interruptions. <br />01381-1 <br />D'\DIVISION 1101381 Audio Documentation doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.