extension shall be based upon the currently approved schedule and on all data <br />relevant to the extension. Such data shall be included in the next monthly updating <br />of the schedule. The Contractor acknowledges and agrees that actual delays in <br />activities which, according to the schedule, do not affect any contract completion <br />date shown by the critical path in the schedule do not Have any affect on the <br />contract completion date or dates, and therefore, will not be the basis for a change <br />therein. <br />F. From time to time it may be necessary for the contract schedule and/or completion <br />time to be adjusted by the Engineer to reflect the effects of job conditions, weather, <br />technical difficulties, strikes, unavoidable delays on the part of the Owner or his <br />representatives, and other unforeseeable conditions which may indicate schedule <br />adjustments and/or completion time extension. Under such conditions, the <br />Contractor shall reschedule the work and/or contract completion time to reflect the <br />changed conditions and the Contractor shat; zvise his schedule accordingly. No <br />additional compensation shall be made to the Contractor for such schedule <br />changes except for unavoidable overall contract time extensions beyond the actual <br />completion of all unaffected work in the contract, in which case the Contractor shall <br />take all possible action to minimize any time extension and any additional cost to <br />the Owner. It is specifically pointed out that the use of available float time in the <br />schedule may be used by the Owner as defined by the Engineer', as well as by the <br />Contractor. Float time is defined as the amount of time between the early start date, <br />and the late start date, or the early finish date and the late finish date, of any of the <br />activities in the schedule. <br />G. The Owner controls the float time in the approved schedule and , therefore; without <br />obligation to extend either the overall completion date or any intermediate <br />completion dates set out in the schedule, the Owner may initiate changes to the <br />contract work that absorb float time only. Owner -initiated changes that affect the <br />critical path on the approved schedule shall be the sole grounds for extending (or <br />contracting) said completion dates. Contractor -initiated changes that encroach on <br />the float time identified in the approved schedule may be accomplished with the <br />Owner's concurrence. Such changes, however, shall give way to Owner -initiated <br />changes competing for the same float time. <br />3.03 COORDINATING SCHEDULES WITH OTHER CONTRACT SCHEDULES <br />N. Where work is to be performed under this contract concurrently with and/or <br />contingent upon work performed on the same facilities or area under other <br />contracts, the Contractor's schedule shall be coordinated with the schedules of the <br />other contracts. The Contractor shall obtain the schedules of the other appropriate <br />contracts from the Engineer and/or Owner for the preparation and updating of his <br />schedule and shall make the required changes in his schedule when indicated by <br />changes in corresponding schedules. <br />*END OF SECTION* <br />01311-4 <br />D.0IVISION 1101311 Construction Schedules.doc <br />