My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br />CLEANING <br />PART 1 — GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />Execute cleaning, during progress of the work, and at completion of the work, as <br />required by General conditions. <br />1.02 DISPOSAL REQUIREMENTS <br />Conduct cleaning and disposal operations to comply with codes, ordinances, <br />regulations, and anti -pollution laws. <br />PART2 - PRODUCTS <br />2.01 MATERIALS <br />A. Use only those cleaning materials which will not create hazards to health <br />or property and which will not damage finishes and surfaces. <br />S. Use only those cleaning materials and methods recommended by <br />manufacturer of the surface material to be cleaned. <br />C. Use cleaning materials only on surfaces recommended by cleaning <br />material manufacturer. <br />PART 3 - EXECUTION <br />3.01 DURING CONSTRUCTION <br />A. Execute periodic cleaning to keep the work, the site, and adjacent <br />properties free from accumulation of waste materials, rubbish, and <br />windblown debris resulting from construction operations. <br />E. Dispose of waste materials, cartons, crating, debris, and rubbish at <br />designated waste receptacles. <br />C. Contractor shall maintain a broom -cleaned site during the entire <br />construction phase. <br />D. For exterior utility work (such as underground pipelines, roadways, <br />service areas, etc.), these shall be cleaned daily. Not less frequently than <br />once weekly. Roadways shall be mechanically broomed. <br />01710-1 <br />0 01VISION 1101710 Cloon ng.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.