My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.02 DUST CONTROL <br />A. General Contractor shall broom -clean interior spaces prior to the start of <br />completing painting and continue cleaning on an as -needed basis until <br />painting is finished. <br />S. Schedule operations so that dust and other contaminants resulting from <br />the cleaning process will not fall on wet or newly -coated surfaces. <br />3.03 FINAL CLEANING <br />A. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels, <br />and other foreign materials. <br />D. Contractor shall broom -clean paved surface; rake -clean other surfaces of <br />the grounds. <br />C. Prior to final completion, Contractor shall conduct an inspection of all <br />work areas to verify that the entire work area is clean. <br />* END OF SECTION * <br />01710-2 <br />DADIVISION 1101710 0eanfng.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.