Laserfiche WebLink
SECTION 02116 <br />DEBRIS REMOVAL <br />GENERAL <br />Description Of Work <br />Contractor shall remove and properly dispose of debris deposited along the pipe route in the <br />Sandridge Golf Course. The debris consists of hurricane debris (i.e.: trees) and miscellaneous <br />concrete, metal scrap, etc, and is located outside the Lateral "G" canal right of way between <br />STA 119+75 and STA 126+75. <br />Contractor shall be responsible for performing all work necessary to mulch and/or remove ALL <br />debris along this portion of the route. <br />Contractor shall be responsible for estimating the volume and composition of debris to be <br />processed prior to bidding the job. <br />Job Conditions <br />The debris is located in an active golf course. All due consideration shall be given to the safety <br />of golf course patrons and to minimize impacts to golf course operations. <br />Contractor shall coordinate with the golf course director during the removal process. <br />Mulch <br />All vegetative debris shall be mulched and deposited in a location suitable to the golf course <br />director. <br />PLsngsai <br />Remove all other debris and dispose of off the Owner's property in a manner approved by local <br />agencies. <br />Restoration <br />Upon completion of mulching/disposal the work area shall be graded smooth and sodded. <br />*END OF SECTION* <br />02116-1 <br />D:UVISION M21 .6 Debm ReinovaWOC <br />