Laserfiche WebLink
SECTION 02200 <br />EARTHWORK <br />GENERAL <br />Description Of Work <br />This section includes the materials and installation standards and contractor responsibilities <br />associated with furnishing all labor, materials, equipment, and incidentals required for clearing, <br />grubbing and filling of undeveloped rights-of-way or corridors, as necessary to provide access <br />for pipeline construction. All clearing work shall be done for the `ull width of the corridor area or <br />right-of-way shown on the drawings and in full accordance with all applicable jurisdictional <br />permits. <br />Unless otherwise specified, all work shall comply with the Florida department of Transportation <br />Standard Specifications for Road and Bridge Construction, latest edition. <br />Materials <br />Fill material shall be clean granular fine earth, granular shell or sand, free of vegetation or <br />organic material. <br />Clearina. Grubbing, And Stripping <br />Remove existing vegetation including trees, roots and stumps from the corridor areas. Prevent <br />damage to trees or other items outside of the corridor area. <br />The Contractor shall dispose of all vegetation material removed in accordance with the <br />applicable jurisdictional agencies. <br />General Excavation <br />Unsuitable material shall be removed from the corridor area oniy as necessary for access and <br />pipeline construction. <br />Excavation and backfill for utility pipelines shall be performed as specified in Section 002610. <br />Filling And Grading <br />Future roadway elevations are shown on the drawings when available from construction plans <br />on file with the Owner or proposed by others. These elevations shall be used as guides for the <br />filling and grading of the corridor. <br />All filling and grading work shall be done to provide corridor access and suitable conditions in <br />preparation for utility pipeline construction. <br />*EMD OF SECTION* <br />02200- 1 <br />D:IDIVISION 2102200 Earthwork.doc <br />