My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02320 <br />HDPE DIRECTIONAL BORE <br />GENERAL <br />Description <br />Portions of the pressure mains shall be installed by the directional boring method within the <br />limits indicated on the contract plans and as specified herein. Generally, as a minirnurn, the <br />pressure main is to be located within the road right-of-way and shall be installed by directional <br />boring. <br />This section includes materials, performance and installation standards. and Contractor <br />responsibilities associated with the furnishing of all labor, materials, equipment and incidentals <br />required to install, complete, required trenchless installation of pressure mains, as shown on the <br />Drawings and as specified herein. <br />Maintenance of Traffic (MOT): No separate payment will be made for the Traffic Control on this <br />project. Costs for Maintenance of Traffic shall be included within the unit price bid for reuse <br />main and directional bores. <br />Maintenance of Traffic shall be per applicable FDOT Index Numbers (600 Series) shall be <br />provided at all times for the duration of the work. <br />Experience <br />The Contractor must demonstrate expertise in trenchless methods by providing a list of ten (10) <br />utility references for which similar work has been performed in the last two years. The <br />references should include a name and telephone number where contact can be made to verify <br />the contractor's capability. The Contractor must provide documentation showing successful <br />completion of the projects used for reference. Conventional trenching experience will not be <br />considered applicable. <br />All supervisory personnel must be adequately trained and shall have at least four (4) years <br />experience in directional boring. The Contractor shall submit the names and resumes of all <br />supervisory field personnel prior to construction. <br />Because of time constraints, the Contractor may wish to provide multiple experienced <br />directional boring crews. <br />The directional boring equipment shall be capable of installing the minimum pipe diameter noted <br />on the plans. <br />02320-1 <br />WDIVISION 2',07.320 Installation by Directional Rori!ig.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.