Laserfiche WebLink
Asphaltic Concrete <br />Prime and Tack Coats: Prime and tack coats shall be applied to the prepared baserock. Prime coat <br />shall be cutback asphalt, Grade RC -70, MC -30, or MC -70, complying with FDOT Specifications, <br />Articles 300-1 through 300-7, applied at the average rate of 0.15 gallons per square yard. <br />Tack coat shall be emulsified asphalt, Grade RS -2, complying with FDOT Specifications, Articles 300- <br />1 through 300-7 respectively, applied at the average rate of 0.10 gallons per square yard. The <br />bituminous quantities are considered as average and are subject to some variation at the discretion of <br />the Engineer and at no additional cost. <br />Plant Mix Wearing Surface: A plant mix wearing surface course shall be constructed on the prepared <br />limerock base. Materials and construction shall conform with the requirements of FDOT Standard <br />Specifications for Type S-1 Asphaltic Concrete, Section 331, and Articles 331-1 through 331-4. The <br />finished pavement replacement shall be smooth and even with, of slightly above, the existing abutting <br />pavement, but shall not have any appreciable bump due to this slight elevation. <br />Rock, Gravel, or Marl Replacement: Roads, streets, or driveways constructed of rock, gravel, or rnarl <br />shall be restored to a condition equal to or better than prior to construction using the same material <br />unless directed otherwise. <br />Temporary Cold Patch: Temporary cold patch for temporary surface as required by Code Section <br />312.08 (c) (d) 1, shall be a commercially available mix approved by the Engineer. <br />Concrete Mix, Design, And Testing <br />Comply with requirements of applicable FDOT Section 345 for concrete mix design, sampling and <br />testing, and quality control, and as herein specified. <br />Design the mix to produce standard weight concrete consisting of Portland cement, aggregate, air- <br />entrairing admixture and water to produce the following properties. <br />1. Compressive Strength - Class I, 3,000 psi. <br />2. Air Content: 3% to 6% <br />Concrete piacerrlent slump shall riot exceed plus or minus one inch from approved design slump. <br />EXECUTION <br />Pavement Replacement <br />Replace pavement in accordance with the details shown on drawings. The baserock shall be placed <br />and compacted in accordance with FDOT Specifications, Section 200. <br />Application of the tack coat shall follow the application of the prime coat immediately prior to the <br />placing of the wearing surface course. <br />Edge Trim <br />Trim edges of the existing pavement with a concrete saw or other approved method to provide a <br />clean, straight edge. <br />02576-3 <br />DADIVISION M2576 Pavement Sidewalk and Driveway Retracement doc <br />