My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation <br />Unless otherwise noted on the drawings or in other sections of this specification, the pipe shall be <br />handled and installed in strict accordance with the manufacturer's instructions. The Contractor <br />shall use every precaution during construction to protect the pipe against the entry of non -potable <br />water, dirt, wood, small animals, and any other foreign material that would hinder the operation of <br />the pipeline. Where the groundwater elevation is above the bottom of the trench, the Contractor <br />shall provide suitable dewatering equipment at no additional cost to the Owner. All piping shall be <br />placed in a dry trench, unless the Engineer of Record and IRCDUS approve wet trench <br />installation. <br />Depth of Cover and Pipe Elevation: Unless otherwise shown on the drawings, or otherwise <br />authorized by the Engineer, all pipe shall have a minimum c7ver of 36 inches. Contractor shall <br />determine top of pipe elevation and top of ground elevation for every two joints of pipe installed <br />using a level. Pipe must have the minimum cover described above and must be within ¢l- 0.2 feet <br />of the top of pipe elevation indicated on the drawings. Installed pipe, which does not meet these <br />requirements, shall be reinstalled until it does meet these requirements. Contractor shall record <br />top of pipe and top of ground elevations and the locations of where these elevations were <br />determined and submit this information to Engineer of Record or his representative and IRCDUS. <br />Engineer of Record or IRCDUS reserves the right to have Contractor excavate and check lop of <br />pipe and top of ground elevations to see if they conform to the aforementioned requirements, at <br />no cost to the Owner. <br />* END OF SECTION * <br />02624-3 <br />D 1DIVISION M2624 Wastewater Force tda,ns Polyvinyl CNonde Pipe due <br />
The URL can be used to link to this page
Your browser does not support the video tag.