My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 92629 <br />EXISTING WASTEWATER MAIN IMPROVEMENTS ABANDONMENT <br />GENERAL <br />Description Of Work <br />This work shall consist of the abandonment of existing wastewater mains that are to be <br />removed from service or to be replaced with new wastewater mains; filling specific sections of <br />pipes to be abandoned in place with grout and/or by physical removal of the wastewater main; <br />including all excavation, backfilling, restoration, M.O.T. and all else necessary. The locations of <br />existing wastewater mains to be abandoned are depicted on u a construction plans. <br />M.O.T. per applicable FDO T Index Numbers (600 Series) shall be provided for at all times ;or <br />the duration of the work. <br />Methods Of Construction <br />The Contractor shall coordinate with the Indian River County Utilities Department (IRCUD) to <br />ensure all remaining pressurized wastewater mains are properly restrained prior to the cutting of <br />any pipe. <br />Prior to abandonment the wastewater main shall be emptied of residual wastewater, either by <br />pumping or by flushing with non -potable water. The Contractor shall submit a flushing/pumping <br />plan to IRCUD and the Engineer. <br />The Contractor shall provide a vacuum truck to recover any spilled wastewater. Recovered <br />wastewater shall be disposed of at a wastewater treatment plant as directed by IRCUD. <br />The Contractor shall be responsible for restoring any areas disturbed as a result of <br />abandonment of existing wastewater mains. <br />In Place Abandonment: Wastewater main to be abandoned in place shall be flushed as <br />described above and capped in areas where the proposed reuse main will not be installed along <br />the wastewater main alignment. <br />Physical Removal Abandonment: The Contractor shall physically remove and dispose of any <br />existing valves, air release valves, and aerial crossings along portions of the wastewater mains <br />sections to be abandoned at the locations depicted on the Construction Plans. <br />The Contractor shall submit a disposal plan for the removed wastewater main and <br />appurtenances. <br />`END OF ;SECTION* <br />02620-1 <br />D:TIVISIGN 2\02629 wastewater Main Abandonment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.