My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTARY CONDITIONS <br />PART I - AMENDMENTS TO GENERAL CONDITIONS <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (EJCDC Document No C-700, 2002 edition) and other provisions of the <br />Contract Documents as indicated below. All provisions which are not so amended or supplemented <br />remain in full force and effect. <br />ARTICLE -1 - DEFINITIONS AND TERMINOLOGY <br />SC -1.01A.43. <br />Delete paragraph 1 01A.43 of the General Conditions in its entirety and replace with the following <br />43 Specifications - Sections included under Division 1 through Division 2 of the Proiect Manual. <br />ARTICLE: 2 - PRELIMINARY MATTERS <br />SC -2.01B. <br />Delete paragraph 2.01 B of the General Conditions in its entirety and replace with the following: <br />B. Before-, any Work at the site is started, Contractor shall deliver to Owner, with copies to Engineer, <br />certificates of insurance, which Contractor rs required to purchase and maintain in accordance with the <br />requirements of the Contract Documents. <br />SC 2.03A <br />Delete paragraph 2.03A of the General Conditions in its entirety, and replace with the following <br />The Contract Times will commence to run on the day indicated in the; Notice to Proceed A Notice <br />to Proceed may be given at any time within 60 days after the Effective Date of the Aoreernent. <br />SC 2.05A1 Add the following immediately at the enol of subparagraph 2.05A1: using the Critical Path <br />Method (CPM). <br />SC 2.05A.4 Add new subparagraph 4 after the existing text of 2.05 of the :general Conditions <br />4. If this Project is an addition to an existing working plant, then the Contractor shall coordinate <br />with the Owner on tie-ins. The Owner shall have final say on plant shut down times and duration to <br />make tits -ins. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />SC -3 01 C <br />Add a new paragraph immediately after Paragraph 3.01 C of the General Cond,tions which is to read <br />as follows: <br />D Each and every provision of law and clause required by law to be inverted in these r; antruct <br />Documents ,hall be deemed to be inserted herein, anti they shall bci read and unfoic:e« sir, though et <br />were included tureen <br />00300-'3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.