Laserfiche WebLink
5C3.03A.3 Delete existing 3.03A.3 of the General Conditions in its entirety and replace it with the <br />following <br />Contractor shall not be liable to Owner or Engineer for failure to report any such conflict, error, ambigu- <br />ity, or discrepancy in the Contract Documents unless Contractor knew or, in the exercise of ordinary <br />care, reasonably should have recognized such conflict, error, ambiguity, or discrepancy and failed to <br />report it in writing to the Owner and the Engineer. <br />SC 3.035 Delete existing 3.0313 of the General Conditions in its entirety and replace it with the <br />following <br />B. Resolving Di=epancies. Except as may be otherwise specifically stated in the Contract <br />Documents, the provisions of the Contract Documents shall be read together as a whole not in <br />isolation so as to give meaning to each provision; however. to the extent there is a conflict or <br />inconsistency behveen or among provisions, the strictest o. lost stringent standard shall apply. <br />ARTICLE 4 -AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; <br />HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS <br />SC 4.01A Delete existing paragraph 4.01 A of the General Conditions in its entirety and replace it with <br />the following: <br />A. Owner shall furnish the site. <br />SC 4.01 B Delete existing paragraph 4.01 B of the General Conditions in its entirety. <br />SC 4.02A Delete 4 02 A.1 of the General Conditions in its entirety and replace it with the following <br />A. Reports and Drawings. The Contract Documents may identify those reports of explorations and <br />tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the <br />Contract Documents. Engineer has relied upon the data obtained from subsurface investigations made <br />at the site in the form of test borings. Such data is in the form of boring logs, which are available upon <br />request. The locations of the test borings are indicated on the Drawings. Such logs and samples are <br />not part of the Contract Documents. <br />SC-4.02A.2 <br />Add the following new sentences immediately at the end of existing paragraph 4.02A 2 of the General <br />Conditions which is to read as follows: <br />In the preparation of Drawings and Specifications, the Engineer has relied upon the reports and tests of <br />subsurface physical conditions at the site The foregoing information and data shown or indicated in the <br />Contract Documents is based on information and data furnished to Owner or the E=ngineer by others The <br />Owner and Engineer shall not be responsible for the accuracy or completeness of any such information <br />or data. and the Contractor shall have full responsibility for requesting, reviewing, and checking all such <br />information and data <br />Sc 4.03A Delete 4103 A of the General Conditions in its entirety and replace it with the following <br />A Notice. The Contractor shall promptly, and before such conditions are disturbed, and in no event <br />later than 10 days after first observance of the conditions, notify the Owner and Engineer in writinq of <br />(1) subsurface or latent physical conditions at the site differing materially frorn those indicated in this <br />Contract, or (2) unknown physical conditions at the site of an unusual nature. differing ineiter9ally from <br />these ordinarily encountered and generally tecognized as inherent in Work of the character provirftact <br />00 800-4 <br />U r '?'0'603 '_- g`f, � ie ter:!+-$ CS;�; <br />