My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:45:07 PM
Creation date
10/5/2015 9:01:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/11/2010
Control Number
2010-119
Agenda Item Number
8.G.
Entity Name
Dickerson Florida, Inc.
Subject
South Relief Canal Project
Bridge Replacement Old Dixie Highway
Area
South Relief Canal
Project Number
0205
Bid Number
2010038
Supplemental fields
SmeadsoftID
8562
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -5.08 Receipt and Application of Insurance Proceeds <br />SC -5.08 Delete GC -5.08 (paragraphs A and B) in its entirety. <br />SC -5.09 Delete GC-5.09(paragraph A)in its entirety. <br />SC -6.02 Labor; Working Hours <br />SC -6.02.13. Add the following paragraphs immediately after paragraph GC -6.02.B: <br />1. Regular working hours are defined as Monday through Friday, excluding Indian <br />River County Holidays, from 7 a.m. to 5 p.m. <br />2. Indian River County Holidays are: New Year's Day, Good Friday, Memorial Day, <br />Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after <br />Thanksgiving, Christmas Eve and Christmas Day. Working on these days will <br />not be permitted without prior written permission and approval from the <br />Construction Coordination Manager. <br />3. The CONTRACTOR shall receive no additional compensation for overtime work, <br />i.e., work in excess of eight hours in any one calendar day or 40 hours in any one <br />calendar week, even though such overtime work may be required under <br />emergency conditions and may be ordered by the ENGINEER in writing. <br />4. All costs of inspection and testing performed during overtime work by the <br />CONTRACTOR, which is allowed solely for the convenience of the <br />CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the <br />OWNER to deduct the costs of all such inspection and testing from any <br />payments otherwise due the CONTRACTOR. <br />5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting <br />from overtime work by the CONTRACTOR, which is allowed solely for the <br />convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a <br />credit given to OWNER to deduct all such costs from any payments otherwise <br />due the CONTRACTOR. <br />6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br />emergency upon specific permission of the ENGINEER. <br />SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC -6.06.C. <br />OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br />entity, to the extent practicable, information about amounts paid to CONTRACTOR on <br />account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br />other individual or entity. <br />SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />B. The OWNER has obtained the following permits (copies of these permits are <br />contained in Appendix "A"): <br />1. St. Johns River Water Management District - Permit no. 40-061-95706-2 <br />2. Indian River Farms Water Control District — Permit no. 07-53 <br />3. Indian River Farms Water Control District — Permit no 06-75 (Bridge) <br />4. Florida Department of Transportation — Permit no. WD31-0039206-733 <br />5. U.S. Army Corps of Engineers - Permit no. SAJ-2007-3746 <br />6. Florida Department of Environmental Protection Permit no. 0039225-002 <br />00800-6 <br />00800 - Supplementary Conditions 06-09 rev.doc <br />00800 6FAEngineering\Capital Projects\0205 Old Dixie Highway Bridge over the South Relief Canal\0205 Contract Documents & Specs\00800 - Supplementary Conditions <br />06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.