My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:45:07 PM
Creation date
10/5/2015 9:01:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/11/2010
Control Number
2010-119
Agenda Item Number
8.G.
Entity Name
Dickerson Florida, Inc.
Subject
South Relief Canal Project
Bridge Replacement Old Dixie Highway
Area
South Relief Canal
Project Number
0205
Bid Number
2010038
Supplemental fields
SmeadsoftID
8562
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Florida Department of Environmental Protection Permit no. WD31- <br />0039206-733 <br />C. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />D. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -13.03 Test and Inspections <br />SC -13.03.13. Delete the first sentence of paragraph GC -13.03.8 in its entirety, and insert the <br />following sentences in its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to <br />perform all initial inspections, tests, or approvals required by the Contract Documents <br />except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals required after initial failing inspections, tests, or <br />approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br />applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br />following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs GC -13.03.0 and 13.03.D <br />below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to <br />paragraph GC -13.04.13 shall be paid as provided in said paragraph 13.04.13; <br />3. tests otherwise specifically provided in the Contract Documents. <br />13.05 OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its <br />place: <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled <br />workers or suitable materials or equipment, or fails to comply with permit <br />requirements, or fails to comply with the technical specifications, or fails to <br />perform the Work in such a way that the completed Work will conform to the <br />Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br />portion thereof, until the cause for such order has been eliminated; however, this <br />right of OWNER to stop the Work shall not give rise to any duty on the part of <br />OWNER to exercise this right for the benefit of CONTRACTOR, any <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br />employee or agent of any of them. <br />14.02 Progress Payments <br />00800-7 <br />00800 - Supplementary conditions 06-09 rev.doc <br />00800 7F:\Engineering\Capital Projects\0205 Old Dixie Highway Bridge over the South Relief Canal\0205 Contract Documents S Specs\00800 - Supplementary Conditions <br />06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.