My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:45:07 PM
Creation date
10/5/2015 9:01:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/11/2010
Control Number
2010-119
Agenda Item Number
8.G.
Entity Name
Dickerson Florida, Inc.
Subject
South Relief Canal Project
Bridge Replacement Old Dixie Highway
Area
South Relief Canal
Project Number
0205
Bid Number
2010038
Supplemental fields
SmeadsoftID
8562
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAINTENANCE OF TRAFFIC: <br />Addendum #2 stated that traffic to 2nd Street north of the bridge shall be maintained during construction <br />and that it was anticipated that a temporary paved by-pass road will be required. After further review, 2nd <br />Street will now be allowed to be closed during construction. The closure will be limited to 45 calendar <br />days. The additional line item, Item 334-1-12C TEMPORARY PAVEMENT @ 2ND STREET, Lump <br />Sum, will be deleted from the Itemized Bid Schedule, Sheet 00310-3. <br />As stated in Addendum #2 and the contract documents, the bridge construction at Old Dixie Highway and <br />the South Relief Canal may be closed to traffic for a period not to exceed 90 calendar days. This will be <br />amended to: the road closure for the bridge construction at Old Dixie Highway and the South Relief Canal <br />may be closed to traffic for a period not to exceed 120 calendar days. <br />DIVISION 2 - TECHNICAL PROVISIONS, Section 00102 Maintenance of Traffic, H. <br />H. For the bridge construction, Old Dixie Highway at the South Relief Canal may be closed to through <br />traffic for a period not to exceed 90 calendar days. The maintenance of traffic plan and the detour <br />plan shall be in place prior to the road closure (See Appendix B MOT Detour Plan). Liquidated <br />damages in the amount of $1,148.00 will apply for each calendar day that expires after the above <br />specified 90 days until Old Dixie Highway is re -opened to through traffic. <br />All traffic through I" Street, 1"t Place, 2nd Street and 2"d Lane, shall be maintained at all times. <br />Access to all driveways shall be maintained at all times. <br />Temporary pavement required to maintain side street and driveway access shall be included in bid <br />Item 102-1 MAINTENANCE OF TRAFFIC under LUMP SUM. Temporary Pavement shall be a <br />minimum of 11 foot lane width, 6 inch thick cemented coquina shell base, and 1 inch asphalt SP <br />9.5. <br />Shall be amended to read: <br />H. For the bridge construction, Old Dixie Highway at the South Relief Canal may be closed to through <br />traffic for a period not to exceed 120 calendar days. 2nd Street may be closed to through traffic for a <br />period not to exceed 45 calendar days. The maintenance of traffic plan and the detour shall be in <br />place prior to the road closure (See REVISED Appendix B MOT Detour Plan). Liquidated <br />damages in the amount of $1,148.00 will apply for each calendar day that expires after the above <br />specified closures. <br />All traffic through 1" Street, I" Place, and 2nd Lane, shall be maintained at all times. Access to <br />all driveways shall be maintained at all times. <br />Temporary access required to maintain side street and driveway access shall be included in bid Item <br />102-1 MAINTENANCE OF TRAFFIC under LUMP SUM. <br />SECTION 00520 — AGREEMENT (Public Works), 4.04, B <br />B. The Old Dixie Highway / South Relief Canal Bridge Replacement; <br />Old Dixie Highway at the South Relief Canal may be closed to through traffic for a period <br />not to exceed 90 calendar days. The maintenance of traffic plan and the detour plan shall be in place <br />prior to the road closure. Liquidated damages in the amount of $1,148.00 will also apply for each <br />calendar day that expires after the above specified 90 days until <br />Old Dixie Highway is re -opened to through traffic. <br />Page 2 of 4 <br />F: fEnrineeringWupital Proiects10205 Old Dixie Highway Bridge over the South Relief CanaAADDENDUMSWdendum 03.doc <br />