Laserfiche WebLink
4. DIVISION 2 - TECHNICAL PROVISIONS, Section 00102 Maintenance of Traffic, H., pages <br />01025-3 and 01025-4, (Revised April 12, 2010) <br />5. SECTION 00520 — AGREEMENT (Public Works), 4.04, B, (Revised April 12, 2010) <br />6. Appendix `B' MOT DETOUR PLAN (Revised April 12, 2010) <br />7. Revised sheets 6, 7, & 8 of 24, construction drawings labeled OLD DIXIE HIGHWAY OVER <br />SOUTH RELIEF CANAL, Project no. A804, IRC no 0205, Revised 4-13-10. <br />*************This Addendum MUST be returned with your Bid************** <br />ADDENDUM NO.3 is submitted 4- i3 - /O <br />Michael Nixon, P.E., Roadway Production Manager <br />and <br />J r Davis, Purchasing Manager <br />Company Name b I / _i 1 <br />n, l <br />1)A <br />Name: �-L C Title: <br />(Type / Printed) <br />Authorized Signature.Date: <br />7" <br />Telephone: -7 0? • 'Id'?. y ` q 4 Fax: % 7� vo <br />Page 4 of 4 <br />F.1EngineerinAlCopiud Projects10205 Old Dixie Highway Bridge over the South Relief CanaAADDENDUMS1Addendum H3.doc <br />