My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-252A (03)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-252A (03)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 4:33:46 PM
Creation date
10/5/2015 10:01:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
10/12/2010
Control Number
2010-252A (3)
Agenda Item Number
10.A.3
Entity Name
Comprehensive Plan
Subject
EAR based Amendments 2030 Comprehensive Plan
Chapter 4 Transportation Element
Supplemental fields
SmeadsoftID
13455
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Transportation Element <br />A third reason hurricane evacuation clearance times will remain adequate is that many of the <br />new units to be constructed on the north barrier island will be in developments like Windsor and <br />Orchid, which have a high number of seasonal residents. Many of these property owners will not <br />be in residence nor contribute to the evacuation population during the peak hurricane season of <br />late summer and early fall. The final reason that future hurricane evacuation clearance times will <br />be adequate is that the Merrill Barber Bridge improvement provided significant additional <br />evacuation capacity. <br />One additional assurance that hurricane evacuation needs will not increase by 2030 is that the <br />Future Land Use Element and the Coastal Management Element of this plan prohibit any <br />increase in allowable density or intensity for land within the designated coastal high hazard area. <br />These elements also prohibit nursing home type facilities in the coastal high hazard area. While <br />these policy initiatives ensure that the at -risk evacuation population will not increase <br />significantly and that evacuation facilities will remain adequate, the county should consider <br />evacuation routes as priorities when awarding funding for new infrastructure such as roadway <br />widening and ITS projects. <br />Concurrency <br />One of the most important issues with respect to the timing of transportation improvements is <br />Concurrency. Concurrency is a principle established by the state's 1985 Local Government <br />Comprehensive Planning and Land Development Regulation Act. According to the provisions <br />of the Act, codified as Chapter 163.3161 of Florida Statutes, no local government may approve a <br />development project unless the services and facilities needed to accommodate that project are <br />available concurrent with the project's impacts. The Capital Improvements element of this plan <br />establishes the County's concurrency management system. <br />Of all the facilities subject to the concurrency requirement, transportation is the most important. <br />It is transportation system deficiencies, more so than problems with other concurrency facilities, <br />that have been responsible for delaying development projects throughout the state. <br />Over the years, the state changed the concurrency law to make the transportation concurrency <br />requirements more flexible. Besides establishing several flexible transportation concurrency <br />options applicable under certain conditions, the state also modified the timeframe for when <br />development project required transportation facilities must be available to comply with the <br />concurrency requirement. Current state law allows development projects to be approved subject <br />to a condition that the necessary facilities needed to serve new development are scheduled to be <br />in place or under actual construction not more than three years after issuance of a building permit <br />or its functional equivalent. <br />This concurrency allowance was considered by the Board of County Commissioners in 1995. At <br />that time, the Board agreed to apply the concurrency rule more conservatively than allowed by <br />the state. Instead of allowing development projects to be approved if the needed improvements <br />will be in place no later than three years after issuance of the building permit for the project, the <br />Board opted to apply a two year after building permit requirement. That allowance was reflected <br />in this element and in the Capital Improvements Element of the plan. <br />Community Development Department Indian River County 83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.