My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/17/1981
CBCC
>
Meetings
>
1980's
>
1981
>
6/17/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:11:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/17/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />OW <br />ARCHITRECT <br />❑ <br />ORDER <br />CONTRACTOR <br />FIELD <br />(] <br />❑ <br />A/A DOCUMENT 6701 <br />OTHER <br />PROJECT: Indian River County <br />(name. address) Courthouse Bldg. <br />TO (Contractor) <br />r Reinhold Construction Inc. <br />P-O.Box 666 <br />Cocoa, FL 32922 <br />CHANGE ORDER NUMBER: 22 <br />7 ARCHITECT'S PRO►ECT NO: 9364 <br />CONTRACT FORAddi t ions b Renovations <br />1 CONTRACT DATE: 4/2/80 <br />You are directed to make the following changes in this Contract: <br />Provide additional duct and diffusers for the courtrooms at the request $2,235.76 <br />of the owner as described in the attached response to CP -44A. All work <br />to be complete and installed in place, <br />The proposed changes in the dark may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that is directly related to this change <br />order. The contractot will be paid for the additional required days <br />at the rate of$300.00 (three hundred) per day for fisted overheard <br />costs. The number of days requested are not reflected In the attached <br />docummentS. <br />The original Ccrtract Sum was . . . . . . . . . . . . . . . . . . . S 689,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . S 114�,6Sq. 84 <br />The Contract Sum prior to this Change Omer vas . . . . . . . . . . . . . . . S 837,689.84 <br />The Contract Sum w1►s be (increased) Xi &s; X—X?G 1i+M by this Change Order . . . $ 2,235.76 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 839.925.60 <br />The Contract Time v.ill be (increased) (decreased) (unchanged) by (- - 1 Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />rnNNFLL MFICALF L EDDY <br />Al 20 o. Dixie Hig Iwai <br />Address <br />Coral Gables, FL 33134By <br />._ <br />DATE <br />_R E IRHOLD CONSTRUCTION 114C <br />KOX X656 <br />Address <br />Cocoa, FL 32922 <br />BY <br />ri.ATE <br />INDIAN RiVER COUNTY <br />�t' 14th Avenue <br />Address <br />Vero Beach, FL 32%0 <br />DATIF <br />AIA DOCUAONT G31 - CHANGE O' APRIL 1970 EDITION • AIAS - ® 1970 - THE ONE PACE <br />AMERICAN IWilIIL C.1r .ARCHITE' WEA YORK AVE., NW, WASHINGTON, D.C. 200106 <br />1 • <br />9 <br />59 <br />fou -1116 FAUr '130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.