My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/17/1981
CBCC
>
Meetings
>
1980's
>
1981
>
6/17/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:11:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/17/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$00K, 46 PAUCE l►31 I <br />JUN 17 ,981 <br />e <br />CHANGE OWNER ❑ <br />f ARCHITECT <br />jJ ORDER CONTRACTOR <br />FIELD ❑ <br />AIA DOCUMENT 0701 OTHER <br />PROJECT: Indian River County CHANGE ORDER NUtmBER: 23 <br />(name address) Courthouse Bldg. <br />TO (Contractor) <br />F ARCHITECT'S PROJECT NO: 9364 <br />Reinhold Construction Inc. CONTRACT FORAdditions & Renovations <br />P.O,Box 666 <br />Cocoa, FL 32922 <br />L ' .CONTRACT DATE:4/2/80 <br />You are directed to make the following changes in this Contract: <br />CP -44 Provide sound baffles complete and installed as described in the 52,218.00 <br />attached reply to CP -44 at the request of the owner in the courtraams. <br />The proposed changes in the rnrk may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that is directly related to this change <br />order. The contractor` will be paid for the additional required days <br />at the rate ofS300.O0 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The <br />original Contract Sum was <br />4 <br />689,000.00 <br />Ne,range <br />by previous Change Orders <br />s <br />150,925,60 <br />Tz r <br />l,ract Sum prior to this Change Order was . . . . . . . . . . . <br />. S <br />839,925.60 <br />Tr -ie <br />C-ontract Sum will be (increased, x xox0nPkN4M ( by !his Change Order . <br />. . $ <br />2,218.00 <br />The <br />new Contract Sum including this Change Order will be. . . . . . . . . <br />. . s <br />842,143-60 <br />The <br />Consract Time will be (increased) (decreasedi (unchanged) by <br />(- - - } Days. <br />The <br />Date of Completion as of the date of this Change Order therefore Is <br />r -ON FLI _�4FTSg1 F £ ra-y__ CRREINHOLD COAtSTRUCTIOs� INC__ <br />IM- <br />Dixie H i 2` y P;'R3Rto', X556 <br />Address S -- Address + _ <br />Loral Gables, FL 33134 Cocoa, FL 32922 <br />@Ytca- QY <br />DATE DAT! -- <br />INDIAN RIVER COUNTY <br />14th Avenue <br />Address <br />Vero Beach, FL 32960 <br />DATE <br />AIA DOCUe+EHT C761 • CHAn; E ORCER • {F'A;. 19% EL";.0N • AI^6 • C 1970 • Tr,F <br />AMERICAry INST'TUTE Of ARCHITECTS 1735 Nfv% NOR& A�L , NA, wA.5tH1Nc,7ON -) C 200Erb ONE P.#kGE <br />_ m go. M <br />
The URL can be used to link to this page
Your browser does not support the video tag.