My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:12:18 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOOTNOTES: <br />9 <br />The County agrees to pay the cost to construct a 6" force main from Master Station <br />No. 1 to the north City limit per page 4. paragraph 7 of the Tripartite Agreement. <br />1,580 L.F. @ $9.50/ft. = $15,010.00 <br />(2) <br />The County's pavement replacement cost is 57% of 185 L.F. @ $10.00/L.F. = $1,055.00. <br />The 185 L.F. is pavement replacement for construction of force main from Master Pump <br />Station No. 1 to the north City limits. See page 4, paragraph 7 of the Tripartite <br />Agreement. <br />(3) <br />Total cost of 10" force main connection is $3,000.00. County's share is based on tilt, <br />cost of a 6" force main connection equal to $800.00. See page 4, paragrpah 7 of <br />the Tripartite Agreement. <br />(4) <br />Total cost of meter and pit is $12,000.00. County's share is 13.8 of $12,000.00. <br />See Appendix A, Item III. <br />(5)Total cost for Master Pump Station No. 2 is $57.000.00. County's share of cost is <br />lw of $57.000.00. See Appendix A, Item II. <br />ENGINEER JOHN ROBBINS GAVE A BRIEF HISTORY RELATING TO <br />THIS MATTER. IN 1978 THE COUNTY DECIDED TO IMPROVE THE PEBBLE BAY <br />SYSTEM BECAUSE OF VARIOUS VIOLATIONS, SPECIFICALLY THE TREATMENT <br />PLANT AND THE VERA CRUZ PUMPING STATION. HE WENT ON THAT THE SYSTEM <br />WAS ABANDONED BY THE DEVELOPER, LOWELL LOHMAN, AND CITATIONS WERE <br />ISSUED BY THE DER. THE JOINT VENTURE THEN MADE RECOMMENDATIONS, PLANS <br />WERE PREPARED, AND PERMITS WERE RECEIVED — ESTIMATES FOR THE IMPROVE— <br />MENTS WERE $106,500 — BUT BIDS WERE REJECTED AND NEGOTIATIONS WERE <br />OPENED UP BETWEEN THE CITY OF VERO BEACH, INDIAN RIVER COUNTY, AND <br />THE TOWN OF INDIAN RIVER SHORES. MR. ROBBINS STATED THAT ONE CONDITION <br />OF THAT AGREEMENT WAS -THAT THE COUNTY AND TOWN WOULD WORK JOINTLY <br />ON THE SYSTEM, WHICH WOULD BE DESIGNED, CONSTRUCTED AND TURNED OVER <br />TO THE CITY. HE CONTINUED THAT DURING THE DEVELOPMENT OF THE PLANS <br />AND SPECIFICATIONS, ANNEXATION WAS CANCELLED FOR AREAS WHICH INCLUDE <br />THE 7-11 STORE, ECKERD'DRUG STORE, AND PEBBLE BEACH VILLAS CONDOMINIUM; <br />IT HAS ALL NOW BEEN RETURNED TO INDIAN RIVER COUNTY. THE TERMS OF <br />THE AGREEMENT, HE NOTED, STATE THAT THE COUNTY LOOKS AFTER THE COUNTY <br />AND THE TOWN LOOKS AFTER THE TOWN. MR. ROBBINS COMMENTED THE BOARD <br />MUST NOW AUTHORIZE THE INCORPORATION OF THOSE PROPERTIES AND THIS <br />WOULD GO INTO WHAT IS THE COUNTY'S PUMP STATION #1, AND THE TOWN OF <br />J U L 1 1991 <br />45 <br />wx 46 PAGE 777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.