My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:12:18 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J U L 1 1981 <br />pau 41-3 pw 776 <br />DESCRIPTION COST <br />1. <br />Furnish and install 8" VCP gravity sewer <br />$ <br />990.00 <br />2. <br />Furnish and install 10" VCP gravity sewer <br />16,155.00 <br />3. <br />Furnish and install 8" D.I.P. gravity sewer <br />742.50 <br />4. <br />Furnish and construct standard manholes <br />3,880.00 <br />(1) <br />5. <br />Furnish and install 10" D.I.P. force main <br />15,010.00 <br />6. <br />Rock excavation <br />600.00 <br />7. <br />Furnish and install 401-- 16" steel casing <br />and 40' - 8" D.I.P. installed by boring and <br />as shown - <br />3,600.00 <br />..jacking <br />. <br />(2) <br />8. <br />Concrete pavement replacement <br />1,055.00 <br />(3) <br />9. <br />Furnish and install 12" X 10" tapping sleeve <br />800.00 <br />and 10" valve on 12" force main <br />(4) <br />10. <br />Furnish and install flow inter, pit, electrical <br />1,656.00 <br />_ <br />work <br />11. <br />Furnish, construct modifications and place <br />27,500.00 <br />into operation Pebble Bay Pumping Station <br />North <br />12. <br />Furnish, construct and place into operation <br />45,000.00 <br />Pebble Bay Ping Station South <br />13. <br />Furnish, construct and place into operation <br />55,000.00 <br />Pumping Station No. 1 <br />(5) <br />14. <br />Furnish, construct and place into operation <br />570.00 <br />Pumping Station No. 2 <br />TOTAL ESTIMATED CONSTRUCTION COST <br />$ <br />172,558.50 <br />ESTIMATED E24GINEERING FEES <br />$ <br />6,500.00 <br />TOTAL ESTIMATED PROJECT COST <br />$ <br />179,058.50 <br />1. Would not have to provide sewer only service. <br />=,2. Acquire area for county park. <br />3. Acquire additional sewer treatment plant for possible use <br />in other parts of the County. <br />DISADVANTAGES <br />1. Most costly of the alternatives. <br />2. Unable to recapture capital cost. <br />J. . J. J n• J. ` <br />$110,000.00 has been previously approved by the Board for this project. <br />RECON M7DATION <br />It is reconmended that: <br />1. Alternative 2 be adopted by the Board of County Coarissioners. <br />2. A County 'CaiTassioner or a committee of Com. issioners be appointed <br />to develop alternative means of financing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.