My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:12:18 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />OWNER <br />ARCHIT[CT <br />❑ <br />B <br />ORDER <br />CONTRACTOR <br />FIELD <br />❑ <br />A/A DOCUMENT G701 <br />OTHER <br />PROJECT: Indian River County <br />(name, address) Administration Building <br />TO (Contractor) <br />F Reinhold Construction inc. <br />P.O.eox 666 <br />Cocoa, FL 32922 <br />CHANGE ORDER NUMBER: 43 <br />7 ARCHITECT'S PROTECT NO:9363 <br />CONTRACT FORAdd 1 t Ions and Renovations <br />L I CONTRACT DATER -2-80 <br />You are directed to make the following changes in this Contract: <br />CP -87A In hallway S-159 provide a shelf azii rai& as shown on sheet 10 <br />of 47 In addendum no. 1. At the oNners request. <br />CP -90 Connect the relOC3ted existing fan coil unit in room 5238 to <br />120V circuit 28-27. At the ownBrs request. _ <br />Total $2, k22.77 <br />$1,527.12 <br />$595.65 <br />The proposed changes In the work may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that is directly related to this change <br />order. The eontractof mill be paid for the addltfonal required 'days <br />at the rate ofS300.00.(three hundred) per day for faxed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The original Contract Suer was . . . . . . . . . . . . . . . . . . . . . $ 2,748,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 290,071.45 <br />The Contract Suns prior to this Change Order was . . . . . . . . . . . . . . . $ , 3,038,071.45 <br />. <br />The Contract Sum will be (increased) this Change Order . . . $ 2.122.77 . <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . S 3,040,194.22 <br />The Contract Time will be (increased) (decreased) (unchanged) by [- - - ) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF t EDDY <br />ARCHITECT <br />132n So- n1m1e stla-hwav <br />Address <br />DATE <br />REINHOLD CONSTRUCTION INC. <br />CONTRACTO <br />P n Anx �5 <br />Address <br />Cocoa, FL 32922 <br />By <br />DATE <br />INDIAN RIVER COUNTY <br />214RS14th Ave <br />Address I . <br />Vero Beach, FL 32960 <br />tl • <br />�. I. . <br />DATE _ Iw ifz. - <br />AIA DOCUMENT GM • CHANGE ORDER • APRIL 1970 EDITION • AIAO • ® 1970 • THE ONE PAGE <br />AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW. WASHINGTON. D.C. 2MM <br />JUL 1 199151 �009 4 PACE 783 <br />
The URL can be used to link to this page
Your browser does not support the video tag.