My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:12:18 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />JUL 1 1981 <br />BDG(• 4u- pnF 734 <br />CHANGE <br />OWNER <br />ARCHITtCT <br />B <br />ORDER <br />CONTRACTOR <br />FIELD <br />❑ <br />AIA DOCUMENT 0701 <br />OTHER <br />PROJECT: Indian River County CHANGE ORDER NUMBER: 49 <br />(name.address) Administration Building <br />TO (Contractor) <br />ARCHITECT'S PROJECT NO:9363 <br />r Reinhold Construction Inc. CONTRACT fORAdditlons_and Renovations <br />P.O.Box 666 <br />Cocoa, FL 32922 <br />L CONTRACT DATE:4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -103 Remove adjust aihd reinstall ten existing plastic laminate $792.61 <br />Item 1 covered doors which -do not operate properly. <br />Item 2 Additl3nal work to provide vertical soffits at spaces $716.09 <br />N103, S101, W134, W148 & 2nd floor cboset, at the owners <br />request to resolve unforeseen problems. <br />Item 3 Additional work to provide vertical soffits at spaces $$29.87 <br />,W122, W123, and N145 at the owners request to resolve _ <br />unforeseen problems. Total $2,338.57 <br />The proposed changes in the work may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that is directly related to this change <br />order. The contractof will be paid for the additional required 'days <br />:n rate of$300.00 (three hundred) per day for fixed overhead <br />The number of days requested are not reflected in the attached <br />,,,,,currents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . S 2,748,000,00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 2.92 ,194.22 <br />The Contract -Sum prior to this Change Order was . . . . . . . . . . . . . . . S 3,040,194.22 <br />The Contract Sum will be (increased) WJXfty t$tXXKftI Jt* by this Change Order. . . $ 2,338-57 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . S 3,042,532.79 <br />'The Contract Time will be (increased) (decreased) (unchanged) by (- - ) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF S. EDDY <br />ARCHITECT <br />i37n So-_ n l v i w m l ahwsa_ <br />Address <br />0 <br />DATE f-71 f <br />REINHOLD CONSTRUCTION INC. <br />CONTRACTOR <br />Address <br />esc 666 <br />Cocoa. FL 32922 <br />l;Y <br />DATE 7' <br />INDIAN RIVER COUNTY <br />OWNER <br />244 14th Ave - <br />Vero Beach FL 32960 <br />A <br />BY +� <br />GATE <br />AIA DOCUMENT GM • CHANGE ORDER • APRIL 11'70 EDITION • AIA® • a 1970 • THE ONE PAGE <br />AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AYE., NW. WASMINGTON. D.C. 200DS <br />
The URL can be used to link to this page
Your browser does not support the video tag.