Laserfiche WebLink
• the vertical mixing of uses around designated town centers, main streets, mixed-use <br />centers, and central squares and greens; <br />• compact clustered development; <br />• separate uses, such as residential and commercial, within a five minute walking distance <br />from each other; <br />• a grid or modified grid street network; <br />• maximum block widths of 400 feet; <br />• native canopy trees along streets; <br />• mid -block alleys for utilities; <br />• rear parking, and garbage pick-up; <br />• parking lots not located between a local street and the building; and <br />• 7 foot wide sidewalks on both sides of streets. <br />According to research, the following mix of uses produces successful TND projects: <br />a. Community open spaces, such as squares or parks, accessible to the public and <br />comprising a minimum of 5% of the total project area. <br />b. Civic uses, such as post offices, community centers, meeting halls, schools, day care <br />centers and cultural facilities, comprising a minimum of 1% of the total project area. <br />c. Residential uses, comprising a minimum of 50% and a maximum of 70% of the total <br />project area. <br />d. Commercial and office uses, comprising a minimum of 25% and maximum of 35% of <br />the total project area. <br />Since 1998, development has commenced on one TND project (Pointe West), while two <br />additional TND projects (Liberty Park and Sunnyside Up) have been approved (the development <br />of Windsor, a gated TND development located on the barrier island, commenced prior to 1998). <br />Both Pointe West and Liberty Park are located along the edge of the urban service area, while <br />Sunnyside Up is located on 26th Street adjacent to the Indian River Mall. While both Pointe West <br />and Liberty Park straddle the urban service area boundary and utilized incentives for projects <br />located partially outside the urban service area, Sunnyside Up is located entirely within the urban <br />service area and utilized the county's 10% density bonus for such TND's. <br />As stated above, only one TND project has been proposed on a site located entirely within the <br />urban service area since 1998. During this same period, numerous conventional suburban -style <br />projects have been developed in the urban service area. While TND developments require <br />approval via the Planned Development (PD) process, conventional development is generally <br />allowed by -right in all zoning districts. <br />In the future, county policies should not favor conventional, suburban style development over <br />TND development. To facilitate increased development of TND projects, the county should <br />remove the regulatory impediments that make approval of TND projects more arduous than <br />Future Land Use Element 104 <br />