Laserfiche WebLink
Comprehensive Plan Potable Water Sub-Element <br /> <br /> <br />Community Development Department Indian River County 27 <br />Table 3.B.9 <br />Summary of Probable Cost for Treatment Technologies Using Various Raw Water <br />Sources <br /> <br />Raw Water Source! <br />Treatment Method! <br />Plant Capacity (mgd) <br />Raw Water <br />Source <br />Concentrate <br />Disposal <br />Capital Cost <br />Annual <br />O&M Cost <br />Production Cost <br />($/1000 gallons)4 <br />Current Costs of UFA Using Low Pressure RO - Actual Costs (FY 2007-2008) <br />13.611 Groundwater <br />Surface <br />Water <br />Discharge <br />$30,000,000 $5,102,572 $2.05 <br />Fresh Surface Water Using Microfiltration/Ultra filtration <br />5 Surface Water N/A2 $14,191,000 $1,078,000 $2.10 <br />10 Surface Water N/A2 $24,397,000 $1.57$1,720,000 <br />15 Surface Water N/A2 $33,064,000 $2,289,000 $1.36 <br />20 Surface Water N/A2 $41,025,000 $2,841,000 $1.22 <br />Surficial Aquifer Using Nanofiltration <br />5 Groundwater <br />Deep <br />Injection Well <br />(DIW) <br />$24,178,000 $1,646,000 <br />$3.42 <br />10 Groundwater DIW $33,576,000 $2,836,000 $2.34 <br />15 Groundwater DIW $41,573,000 $3,913,000 $1.95 <br />20 Groundwater DIW $50,188,000 $4,992,000 $1.75 <br />Continued Use of UFA Using Low Pressure RO-New WTP and Wellfield <br />5 Groundwater DIW $34,693,000 $1,758,000 $4.41 <br />10 Groundwater DIW $48,579,000 $3,181,000 $3.04 <br />15 Groundwater DIW $64,086,000 $4,526,000 $2.65 <br />20 Groundwater DIW $79,077,000 $5,910,000 $2.42 <br />Seawater RO Treatment <br />5 Surface/ <br />Ground Water3 DIW $39,429,000 $3,145,000 $5.95 <br />10 Surface/Ground <br />Water3 DIW $64,094,000 $6,230,000 $4.77 <br />15 Surface/Ground <br />Water3 DIW $92,828,000 $9,248,000 $4.48 <br />20 <br /> <br />Surface/Ground <br />Water3 DIW $115,436,000 $12,432,000 $4.18 <br /> <br />113.61 mgd is new WTP capacity expansion at north county RO plant; actual average production for the FY2008-2009 is projected <br />to be 8.89 mgd. Production cost based on actual average production estimate of 8.89 mgd (3,246 mgy) <br />2MF/UF do not produce a concentrate steam as with nanofiltration and RO systems. Residuals need to be removed from the <br />backwash water and chemicals in the backwash solution may require neutralization prior to disposal. <br />3Costs include only treatment. Cost of an influent pipeline or deep well to the Boulder Zone as a source is not included. Deep Injection <br />Well disposal would vary between $5.5 million and $11 million for the water treatment plant capacities presented. 4Annual O&M and <br />production costs are based on average daily demand using a maximum daily demand/annual average daily demand ratio. <br /> <br />As a future long-range source of potable water, surface water located in western Indian River