My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-044
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:04:00 PM
Creation date
10/5/2015 9:01:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
02/09/2010
Control Number
2010-044
Agenda Item Number
12.A.1.
Entity Name
Indian River County 2010 EECBG Energy Efficiency Project
Subject
FPL Energy Audit
Supplemental fields
SmeadsoftID
8607
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NARRATIVE (cont.) <br /> D. PROJECT DESCRIPTION: Indicate the eligible activity(ies) selected and provide a detailed <br /> description of the work to be performed for the project. Include maps, graphs, charts, etc. to support <br /> project activities. Project descriptions should consist of a list of major tasks for accomplishing the project <br /> with specific sub-activities detailed within each task heading. This section is limited to two pages. If <br /> multiple jurisdictions choose to partner in their application, the page limit is increased to three pages. <br /> Pages submitted beyond the page limit will not be reviewed. <br /> Program Administration <br /> Select a Program Administrator: Complete <br /> The administrator will insure all DOE-ARRA requirements are followed and all required reports are submitted to the <br /> Florida Energy and Climate Commission in a timely manner. <br /> Replacement of Traffic Signalization Lighting with LED Technology <br /> Purchase LED Lighting: The first step in this project will be to purchase the LED lighting from a supplier. <br /> Installation of LED Lighting: County staff will retrofit the existing traffic signals,and install the new LED <br /> lighting under the supervision of the County Public Works Director. <br /> Retrofit Gifford Community Center <br /> Contract with a Project Administrator and Florida Power and Light Corporation: Contract with Fred Fox <br /> Enterprises for project Administration and Florida Power and Light Corporation for Professional Consulting <br /> Services. <br /> Plans and Specifications: <br /> Engineering Study: An energy audit and engineering study will be conducted by Florida Power and Light <br /> Corporation to determine the specific elements to include in the retrofitting of the Gifford Community Center. <br /> Plans: The energy audit and engineering study shall be used to create a set of construction plans that will <br /> detail the activities included in the retrofit of the Gifford Community Center. This includes the location and number <br /> of all existing lights to be replaced as well as the replacement of the five HVAC systems currently serving the <br /> building. <br /> Specifications: The consultant will specify the type of lighting, insulation,and HVAC units to be used <br /> throughout the Gifford Community Center. <br /> Construct the Project: Florida Power and Light Corporation will replace the existing exit signs,fluorescent lamps, <br /> ballast,acrylic lens and incandescent lamps. The five existing HVAC systems will be replaced. Florida Power and <br /> Light Corporation will install new energy efficient lighting throughout the building. <br /> Verification of Savings: After the project has been completed and approved,County staff will monitor the <br /> reduction in the electric usage resulting from the building retrofit. <br /> Supplementing the Existing Gas Water Heater at the County Jail Facility with a Solar Water Heater <br /> Contract with Florida Power and Light Corporation to Develop Plans and Specifications: Florida Power and <br /> Light Corporation will put together plans and specifications that will detail the design of the solar water heating <br /> system. The plans will include all necessary details to construct the project. <br /> Construction of Solar Water Heater: Florida Power and Light Corporation will install the solar hot water heating <br /> system. <br /> Energy Efficiency and Conservation Block Grant Application <br /> Attachment A—Grant Application Form <br /> Page 5 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.