My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-044
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:04:00 PM
Creation date
10/5/2015 9:01:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
02/09/2010
Control Number
2010-044
Agenda Item Number
12.A.1.
Entity Name
Indian River County 2010 EECBG Energy Efficiency Project
Subject
FPL Energy Audit
Supplemental fields
SmeadsoftID
8607
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NARRATIVE (cont.) <br /> E. PROJECT MILESTONES/DELIVERABLES/OUTPUTS: Identify the month of the project during <br /> which each task will start and be completed. Identify in which months of the project the <br /> outputs/deliverables will be accomplished. This section is limited to three pages. If multiple jurisdictions <br /> choose to partner in their application, the page limit is increased to five pages. Pages submitted beyond <br /> the page limit will not be reviewed. <br /> Project Milestones/Deliverables/Outputs <br /> Task Start Task Complete <br /> Task <br /> Contract with Fred Fox Enterprises for project administration Month 1 Month 1 <br /> and Florida Power and Light Corporation for design and <br /> construction services <br /> County orders and receives LED lighting components for Month 1 Month 3 <br /> traffic signals <br /> Florida Power and Light Corporation develops the plans and Month 2 Month 5 <br /> specifications for installation of the solar water heater at the <br /> county jail facility <br /> Florida Power and Light Corporation develops the plans and Month 2 Month 6 <br /> specifications for retrofitting the Gifford Community Center <br /> County Public Works Department retrofits traffic signals with Month 3 Month 12 <br /> LED lighting <br /> Florida Power and Light Corporation installs the solar water Month 6 Month 12 <br /> heater at the County jail facility <br /> Florida Power and Light Corporation carries out the Month 7 Month 14 <br /> retrofitting of the Gifford Community Center <br /> Output/Deliverables Month <br /> Accomplished <br /> Plans and specifications for retrofitting Gifford Community Center Month 6 <br /> Plans andspecifications for solar hot water heating at County jail facility Month 5 <br /> Traffic signals upgraded with new LED lighting Month 13 <br /> Installation of solar water heating system at County jail facility complete and Month 13 <br /> operational <br /> Retrofitting of Gifford Community Center complete Month 15 <br /> Reduction in Indian River County energy cost and reduction in greenhouse Month 13 <br /> gases resulting from completion of traffic signal LED conversion and utilization <br /> of the solar water heater at the County jail facility <br /> Additional reduction in Indian River County energy costs and reduction in Month 16 <br /> greenhouse gases realized with completion of the Gifford Community Center <br /> Retrofitting project <br /> Energy Efficiency and Conservation Block Grant Application <br /> Attachment A—Grant Application Form <br /> Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.