My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/15/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/15/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:16:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 6,WERS . <br />OWNER ❑ <br />"HANGS ARCHITECT ❑ <br />3RDER CONTRACTOR [j <br />FIELD <br />,IA DOCUMENT 0701 OTHER <br />ROJECT: Indian River County CHANGE ORDER NUMBER: 46 <br />iame.address) Administration Building <br />0 (Contractor) <br />Reinhold Construction Inc. <br />P.o.Box 666 <br />Cocoa, FL 32922 <br />ARCHITECT'S PROJECT NO:9363 <br />CONTRACT FORAdd i t ions and Renovations <br />L 1 CONTRACT DATE:4-2-80 <br />w are directed to make the following changes in this Contract: <br />CP -82 Provide magnetic door holders for door .S201 and the necessary $1,214.87 <br />electrical supply for the holders to funstion.At owners request. <br />2 <br />he proposed changes in the w.)rk may result In additional time <br />equired beyond the contract completion date. Additional time <br />iii be added to the contract that Is directly related to this change <br />rder.-•The contractot will be paid for the additional required days <br />t the rate of$300.00.(three hundred) per day for fixed overhead <br />osts. The number of days requested are not reflected In the attached <br />acuments. <br />e original Contract Sunt was . . . . . . . . . . . . . . . . . . . . . % 2 , 748 , 000.00 <br />A chang a ..,v previous Change Orders . . . . . . . . . . . . . . . . . . $ 286,717.26 <br />e Contrac Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 3,034,717.26 <br />e Contract Sum• will be (increased) =W&W&*kX*ydWby this Change Order. . .$ 1,214.87 <br />r new Contract Sum including this Change Order will be . . . . . . . . . . . $ 3,035,932.13 <br />e Contract Ttime will be (increased) (decreased) (unchanged) icy (- - -) gays. <br />e Date of Completion as of the date of this Change Order therefore is <br />JNNELL METCALF & EDDY <br />CHITECi <br />320 Sam ntx1e Highwxay <br />dress <br />gyral <br />REINHOLD CONSTRUCTION INC. <br />CONTRACTO6 <br />Vin nX65 <br />Address <br />Cocoa. FL 32922 <br />DATE <br />DOCUMENT GnI - CHANGE ORDER - AMIL 11'70 EDITION - AIA8 - ® 1970 - THE <br />LRICAN INSTITUTE OF ARCHITECTS, 17is NEW yMK AVE., NW. WASHINGTON, D.C- 230% <br />r <br />INDIAN RIVER COUNTY <br />owMsER <br />14th Ave <br />Address <br />Vero Beach, Irl 329GO <br />By <br />ONE FACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.