My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/15/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/15/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:16:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i�� OWNER <br />�a oP�iNG ARCHITECT <br />ORDER FIELD FIELD ❑ <br />AIA DOCUMENT 0701 OTHER <br />PROJECT: Indian River County CHANGE ORDER NUMBER: 47 <br />(name, address) Administration a u 11 d i ng <br />TO (Contractor) <br />ARCHITECT'S PROJECT NO:9363 <br />r Reinhold Construction Inc. CONTRACT FORAddit(ons and Renovations <br />P,A.Box 666 <br />Cocoa, FL 32922 <br />L J CONTRACT DATE: 4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -86 At the request of the owner provide electrical power to magnetic $2,139.32 <br />holders for Corredor doors S140, S153, & S168. <br />The proposed changes In the work may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that Is directly related to this. change <br />order. The contractot will be palid for the additional required days <br />at the rate of$300.00.(three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ 2 , 748 , 000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 287,932.13 <br />. <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . S 3,035,932.13 <br />The Contract Sum will be (increased) CAMS14S tMW4by this Change Order . . . $ 2,139.32 <br />The new Contract Sum including this Change Order will be . . ... . . . . . . . S 3,038,071.45 <br />i he Contract Time will be (increased) (decreased) (unchanged) by ( I Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF b EDDY <br />ARCHITECT <br />132n Sa tt1vle HlChway. <br />4ddress <br />J <br />REINHOLD CONSTRUCTION INC. <br />CONTRACTOR <br />P n Rox 666 <br />Address - <br />Cocoa, FL 32922 <br />By <br />DATE , <br />INDIAN RIVER COUNTY <br />QNVN <br />21458 14th Ave <br />Address , <br />Vero Reach, FL 32960 <br />sY� <br />DATE L d <br />T - <br />UA DOCUMENT GM ° CHANGE MDR • APRIL 7470 EDITION - AIA® 1970 - THE ONE PACE <br />NAALRICAN INSTITUTE Of ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C- MM <br />r <br />• F <br />BOOK46PACE- <br />JUL 15 198, 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.