My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/15/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/15/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:16:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UL 15199` <br />6 PA � 5. <br />CHANGE'. OWNER. j] <br />ARCHITECT [] <br />ORDER CONTRACTOR <br />FIELD ' <br />AIA DOCUMENT 0701 OTHER <br />PROJECT:*Indian River County CHANGE ORDER NUMBER:52 <br />(name, address) Administration Building . <br />TO (Contractor) <br />ARCHITECT'S PROJECT NO:9363 <br />• - Reinhold Construction Inc. CONTRACT €ORAddltlons and Renovations <br />- P.O.Box 666 <br />Cocoa, FL 32922 <br />�• CONTRACT DATE: 4 -2 -Bo <br />You are directed to make the following changes in this Contract: <br />item #1 <br />Provide for new door W129, as existing.hardware is not $1,302.63 <br />suitable. At the oa:itrs.request to meet unforeseen. <br />conditions. <br />Jnr! proposed changes in the uric may result in additional time <br />::.Fred -beyond the -contract completion date. Additional time <br />wi)r be•added to the contract that i.s directly related to this change <br />order. --The contractot •wi l 1 be paid for the -additional -required slays <br />at the .rate off$300.00-(three hundred) per day for fixed overhead . <br />costs. The nuMber of days requested are not reflected in the attached <br />documents. <br />The original. Corttract Sura Was . ' . _ S 2 , 748 , 000.00 <br />fMet change by previous Change Orders* . . . . ..S • 309,279.71 <br />The Contract Sum prior to this Change Order was. ... ' . _ . . . . . . 3,057,279-71 <br />The Contract Sum Wiii be (increased) (d&f1(AMUMkM9dAy this Change Order. . S 1,302.63 <br />The new Contract Sum including this Change Order will be S 3,058,582.34 <br />The Contract Time Will be (increased) (decreased) (unchanged) by ( - -) Days. <br />The Date of Compietion as of the date of this Change Order therefore is <br />CONNELL METCALF t EDDY REINNOLD CONSTRUCTION INC. INDIAN RIVER COUNTY <br />ARCHITECT COM•RACTO OWNER <br />__132n scl' n 1 M t e u�hwav R Q x ��5 14S 14th Ave <br />Address Address Address <br />ora abI es.4 Cocoa, EL 32922 Vero Beach FL 32960 <br />Y ► 2V <br />ATE 7� 8� • DATE �— / G• _ J17 DATE, <br />AIA DOCUMINT CM fl CHANGE ORDER • APRIL 1870 EDITION • AIA® • C IM ° THE ONE PAGE <br />AMIRICAN INSTITU71 Of ARCHITECTS. 1735 NEW YORK AVE, "W. WASHINCTON. D.C. <br />A <br />- M. M <br />
The URL can be used to link to this page
Your browser does not support the video tag.