My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/15/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/15/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:16:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANCE <br />WNER <br />AO CHITE& <br />i <br />{ ORDER <br />CONTRACTOR <br />FIELD <br />13 <br />aGT07 <br />OTHER <br />AIA DDCUAAENY <br />PROJECT: Indian River County CHANGE ORDER NUMBER: 53 <br />dname.address) Administration Building <br />TO (Contractor) <br />FARCHITECT'S PROJECT NO.9363 <br />teinhold Construction inc. CONTRACT FORAddttions and Renovations <br />• <br />p.0 Box 666 <br />Cocoa, FL 32922 <br />•L J CONTRACT DATE: 4-2-80 <br />You are directed to snake the following changes in this Contract: <br />CP -89 • Provide 2 X 4.d15208na cel <br />l Ing <br />o,vnersthe <br />hallw�.y between $215.43 <br />rooms S207 an panic $1,253.35 <br />CP -92 'Provide the neeessa ry harda3re, including p <br />hardware for door W159 at the owners request. <br />CP -96 Replace door S156 with "A".label doors and frame. <br />Provide necessary hardware. Show credit for%*.>oj $363.60 <br />doors in schedule, at the request of the owner <br />to. correct unforeseen condition. Total- —P <br />1,832.3 <br />The proposed changes In the tnrlc awy result in additional time <br />required beyond the contract completion date. Additional time <br />will be'added to the contract Yhat 1s directly related to this change <br />order: -The contractor• will be paid for the additional required days <br />at the rate of$300.00 .(three hundred) per day for fixed overhead <br />costs. The slumber of days requested are not reflected in the attached <br />documents. <br />-The original Contract Sum WAS . ... . ' . . . . . . . . . . . S 2,748,000.00.24 , 71+8 , 000.00 <br />wet change by previous Change Order; . . . . . ... . . . . . . . . $ 310,582. 24 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . S 3,058,582.24 <br />The Contract Sum will be (increased)X4Uer RXl h Xby this Change ®rder . . S 1 832.35 <br />The new Contratt Sum Including this Change Order will be .. S 3,060:414.6 2 . <br />`The Contract Time will be (increased) (decreased) (unchanged) by (- - - ) Days. <br />The Date of Completion as of the date of this Change Order therefore Is • <br />REINHOLD CONSTRUCTION INC. <br />CONNELL METCALF t EDDY <br />ARCHITECT E01mle H ghway • <br />Address <br />CO0NTR <br />x o4r, • <br />Address <br />Cocoa FL 32922 <br />13Y r� � <br />DATE ' ';7 % l <br />INDIAN RIVER COUNTY <br />OWfIt <br />,2, VS .14th Aye - <br />Address <br />Vero Beach. FL _32960 <br />ey -_'Sk� <br />DATE I-^ <br />-AIA DOCUIN[NT CF09'• CHO= OADER • APRIL 9170 EDITION a AIA® • ® 9570 • 'THE ONE PAG[ <br />AMERICAN INSTITUTE of ARCHITECTS, Ills NtW V021C AVE., NW, WASHINGTON. D.C- 20006 <br />JUL 151981 <br />U: Pic <br />87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.