Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />1. Submit selection and verification samples for product type, designs and textures. <br />E. Quality Assurance Submittals: <br />1. Test Reports: Submit certified test reports showing compliance with specified <br />performance characteristics and physical properties, if required. <br />2. Manufacturer's technical data sheets for laminate and adhesives. <br />3. Manufacturer's Material Safety Data Sheets (MSDS). <br />4. Certifications: <br />a. Recycled Content. <br />b. Forest Stewardship Council (FSC). <br />c. VOC compliance with local jurisdictions. <br />F. Maintenance: Submit 2 copies of manufacturer's Care and Maintenance Guide. <br />1.5 REGULARY REQUIREMENTS <br />A. Adhesives: <br />1. SCAQMD (South Coast Air Quality Management District). <br />2. Ozone Transport Commission (OTC) model Rule for Adhesives and Sealants. <br />1.6 QUALITY ASSURANCE <br />A. Qualifications: <br />1. Manufacturer Qualifications: Manufacturer producing product in ISO 9001 certified <br />facility. <br />2. Fabricator/Installer must be experienced in performing work of similar type and scope. <br />B. Mock -Ups: <br />1. Install at project site using acceptable products and manufacturer approved installation <br />methods. Obtain Architect's acceptance of finish color, texture, pattern, fabrication, and <br />installation standards. Comply with Division 01 Quality Control (Mock -Up <br />Requirements) Section. <br />2. Mock -Up Size: 12'x 12' <br />3. Maintenance: Maintain mock-up during construction for fabrication and installation <br />comparison. If required, remove and legally dispose of mock-up when no longer <br />required. <br />4. Incorporation: If allowed, mock-up may be incorporated into final construction upon <br />Architect's approval. <br />DECORATIVE PLASTIC LAMINATE 060620-2 <br />