My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />PART 2- PRODUCTS <br />2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL <br />A. Time Frame: Extend schedule from date established the Notice to Proceed to date of Final <br />Completion. <br />1. Contract completion date shall not be changed by submission of a schedule that shows an <br />early completion date, unless specifically authorized by Change Order. <br />B. Activities: Treat each story or separate area as a separate numbered activity for each main <br />element of the Work. Comply with the following: <br />1. Activity Duration: Define activities so no activity is longer than 20 days, unless <br />specifically allowed by Architect. <br />2. Submittal Review Time: Include review and resubmittal times indicated in <br />Section 01330 "Submittal Procedures" in schedule. Coordinate submittal review times in <br />Contractor's construction schedule with submittal schedule. <br />3. Startup and Testing Time: Include no fewer than 15 days for startup and testing. <br />4. Substantial Completion: Indicate completion in advance of date established for <br />Substantial Completion, and allow time for Architect's administrative procedures <br />necessary for certification of Substantial Completion. <br />5. Punch List and Final Completion: Include not more than 30 days for completion of <br />punch list items and final completion. <br />C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and <br />as follows in schedule, and show how the sequence of the Work is affected. <br />1. Phasing: Arrange list of activities on schedule by phase. <br />2. Work under More Than One Contract: Include a separate activity for each contract. <br />3. Work by Owner: Include a separate activity for each portion of the Work performed by <br />Owner. <br />4. Work Restrictions: Show the effect of the following items on the schedule: <br />a. Coordination with existing construction. <br />b. Uninterruptible services. <br />c. Partial occupancy before Substantial Completion. <br />d. Environmental control. <br />5. Work Stages: Indicate important stages of construction for each major portion of the <br />Work, including, but not limited to, the following: <br />a. Subcontract awards. <br />b. Submittals. <br />c. Purchases. <br />d. Mockups. <br />e. Fabrication. <br />f. Sample testing. <br />g. Deliveries. <br />h. Installation. <br />CONS fRUCTION PROGRESS DOCUMENTATION 01 32 00 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.