My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />Tests and inspections. <br />j. Adjusting. <br />k. Curing. <br />1. Building flush -out. <br />m. Startup and placement into final use and operation. <br />6. Construction Areas: Identify each major area of construction for each major portion of <br />the Work. Indicate where each construction activity within a major area must be <br />sequenced or integrated with other construction activities to provide for the following: <br />a. Structural completion. <br />b. Temporary enclosure and space conditioning. <br />c. Permanent space enclosure. <br />d. Completion of mechanical installation. <br />e. Completion of electrical installation. <br />f. Substantial Completion. <br />D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but <br />not limited to, the Notice to Proceed, Substantial Completion, and final completion. <br />E. Cost Correlation: Superimpose a cost correlation timeline, indicating planned and actual costs. <br />On the line, show planned and actual dollar volume of the Work performed as of planned and <br />actual dates used for preparation of payment requests. <br />F. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days <br />behind the current approved schedule, submit a separate recovery schedule indicating means by <br />which Contractor intends to regain compliance with the schedule. Indicate changes to working <br />hours, working days, crew sizes, and equipment required to achieve compliance, and date by <br />which recovery will be accomplished. <br />2.2 STARTUP CONSTRUCTION SCHEDULE <br />A. Bar -Chart Schedule: Submit startup, horizontal, bar -chart -type construction schedule within <br />seven days of date established for the Notice to Proceed. <br />B. Preparation: Indicate each significant construction activity separately. Identify first workday of <br />each week with a continuous vertical line. Outline significant construction activities for first 90 <br />days of construction. Include skeleton diagram for the remainder of the Work and a cash <br />requirement prediction based on indicated activities. <br />2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE) <br />A. General: Prepare network diagrams using AON (activity -on -node) format. <br />B. Startup Network Diagram: Submit diagram within 14 days of date established for the Notice to <br />Proceed. Outline significant construction activities for the first 90 days of construction. Include <br />skeleton diagram for the remainder of the Work and a cash requirement prediction based on <br />indicated activities. <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.