Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />SECTION 01 33 00 - SUBMITTAL PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes requirements for the submittal schedule and administrative and procedural <br />requirements for submitting Shop Drawings, Product Data, Samples, and other submittals. <br />B. Related Requirements: <br />1. Section 01 32 00 "Construction Progress Documentation" for submitting schedules and <br />reports, including Contractor's construction schedule. <br />2. Section 01 78 10 "Project Record Documents" for submitting record Drawings, record <br />Specifications, and record Product Data. <br />1.3 DEFINITIONS <br />A. Action Submittals: Written and graphic information and physical samples that require <br />Architect's responsive action. Action submittals are those submittals indicated in individual <br />Specification Sections as "action submittals." <br />B. Informational Submittals: Written and graphic information and physical samples that do not <br />require Architect's responsive action. Submittals may be rejected for not complying with <br />requirements. Informational submittals are those submittals indicated in individual <br />Specification Sections as "informational submittals." <br />C. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and <br />from another computer over a network and that serves as the basis for standard Internet <br />protocols. An FTP site is a portion of a network located outside of network firewalls within <br />which internal and external users are able to access files. <br />D. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems <br />used for representing documents in a device -independent and display resolution -independent <br />fixed -layout document format. <br />1.4 ACTION SUBMITTALS <br />A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates <br />required by construction schedule. Include time required for review, ordering, manufacturing, <br />fabrication, and delivery when establishing dates. Include additional time required for making <br />SUBMITTAL PROCEDURES 01 33 00 - 1 <br />