My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />corrections or revisions to submittals noted by Architect and additional time for handling and <br />reviewing submittals required by those corrections. <br />1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and <br />Contractor's construction schedule. <br />2. Initial Submittal: Submit concurrently with startup construction schedule. Include <br />submittals required during the first 60 days of construction. List those submittals <br />required to maintain orderly progress of the Work and those required early because of <br />long lead time for manufacture or fabrication. <br />3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's <br />construction schedule. <br />a. Submit revised submittal schedule to reflect changes in current status and timing <br />for submittals. <br />4. Format: Arrange the following information in a tabular format: <br />a. Scheduled date for first submittal. <br />b. Specification Section number and title. <br />c. Submittal category: Action; informational. <br />d. Name of subcontractor. <br />e. Description of the Work covered. <br />f. Scheduled date for Architect's final release or approval. <br />g. Scheduled date of fabrication. <br />h. Scheduled dates for purchasing. <br />Scheduled dates for installation. <br />j. Activity or event number. <br />1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS <br />A. Architect's Digital Data Files: Electronic digital data files of the Contract Drawings will not be <br />provided by Architect for Contractor's use in preparing submittals. <br />B. Coordination: Coordinate preparation and processing of submittals with performance of <br />construction activities. <br />1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other <br />submittals, and related activities that require sequential activity. <br />2. Submit all submittal items required for each Specification Section concurrently unless <br />partial submittals for portions of the Work are indicated on approved submittal schedule. <br />3. Submit action submittals and informational submittals required by the same Specification <br />Section as separate packages under separate transmittals. <br />4. Coordinate transmittal of different types of submittals for related parts of the Work so <br />processing will not be delayed because of need to review submittals concurrently for <br />coordination. <br />a. Architect reserves the right to withhold action on a submittal requiring <br />coordination with other submittals until related submittals are received. <br />SUBMITTAL PROCEDURES 01 33 00 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.