Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />a. Project name. <br />b. Date. <br />c. Name and address of Architect. <br />d. Name of Construction Manager. <br />e. Name of Contractor. <br />f. Name of firm or entity that prepared submittal. <br />g. Names of subcontractor, manufacturer, and supplier. <br />h. Category and type of submittal. <br />i. Submittal purpose and description. <br />j. Specification Section number and title. <br />k. Specification paragraph number or drawing designation and generic name for each <br />of multiple items. <br />I. Drawing number and detail references, as appropriate. <br />m. Location(s) where product is to be installed, as appropriate. <br />n. Related physical samples submitted directly. <br />o. Indication of full or partial submittal. <br />P. Transmittal number[, numbered consecutively]. <br />q. Submittal and transmittal distribution record. <br />r. Other necessary identification. <br />s. Remarks. <br />F. Options: Identify options requiring selection by Architect. <br />G. Deviations and Additional Information: On an attached separate sheet, prepared on Contractor's <br />letterhead, record relevant information, requests for data, revisions other than those requested <br />by Architect on previous submittals, and deviations from requirements in the Contract <br />Documents, including minor variations and limitations. Include same identification information <br />as related submittal. <br />H. Resubmittals: Make resubmittals in same form and number of copies as initial submittal. <br />1. Note date and content of previous submittal. <br />2. Note date and content of revision in label or title block and clearly indicate extent of <br />revision. <br />3. Resubmit submittals until they are marked with approval notation from Architect's action <br />stamp. <br />I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, <br />fabricators, installers, authorities having jurisdiction, and others as necessary for performance of <br />construction activities. Show distribution on transmittal forms. <br />J. Use for Construction: Retain complete copies of submittals on Project site. Use only final <br />action submittals that are marked with approval notation from Architect's action stamp. <br />SUBMITTAL PROCEDURES 01 33 00 - 5 <br />