Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />a. Submit one copy of submittal to concurrent reviewer in addition to specified <br />number of copies to Architect. <br />5. Transmittal for Paper Submittals: Assemble each submittal individually and <br />appropriately for transmittal and handling. Transmit each submittal using a transmittal <br />form. Architect will return without review submittals received from sources other than <br />Contractor. <br />a. Transmittal Form for Paper Submittals: Use AIA Document G810. <br />b. Transmittal Form for Paper Submittals: Provide locations on form for the <br />following information: <br />1) Project name. <br />2) Date. <br />3) Destination (To:). <br />4) Source (From:). <br />5) Name and address of Architect. <br />6) Name of Construction Manager. <br />7) Name of Contractor. <br />8) Name of firm or entity that prepared submittal. <br />9) Names of subcontractor, manufacturer, and supplier. <br />10) Category and type of submittal. <br />11) Submittal purpose and description. <br />12) Specification Section number and title. <br />13) Specification paragraph number or drawing designation and generic name <br />for each of multiple items. <br />14) Drawing number and detail references, as appropriate. <br />15) Indication of full or partial submittal. <br />16) Transmittal number[, numbered consecutively]. <br />17) Submittal and transmittal distribution record. <br />18) Remarks. <br />19) Signature of transmitter. <br />E. Electronic Submittals: Identify and incorporate information in each electronic submittal file as <br />follows: <br />1. Assemble complete submittal package into a single indexed file incorporating submittal <br />requirements of a single Specification Section and transmittal form with links enabling <br />navigation to each item. <br />2. Name file with submittal number or other unique identifier, including revision identifier. <br />a. File name shall use project identifier and Specification Section number followed <br />by a decimal point and then a sequential number (e.g., LNHS-06100.01). <br />Resubmittals shall include an alphabetic suffix after another decimal point (e.g., <br />LNHS-06100.01.A). <br />3. Provide means for insertion to permanently record Contractor's review and approval <br />markings and action taken by Architect. <br />4. Transmittal Form for Electronic Submittals: Use electronic form acceptable to Owner, <br />containing the following information: <br />SUBMITTAL PROCEDURES 01 33 00 - 4 <br />